1 / 4

PERT 2010 Programme draft

PERT 2010 Programme draft. PERT 2010 draft programme. Favoured themes for 2010 Asset strategies How to embed Continuous Improvement and get people involved at all levels – Hartlepool TMD??? Competency from engineers to shop floor operations and suppliers, models and mechanisms

jolie
Download Presentation

PERT 2010 Programme draft

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PERT 2010 Programme draft

  2. PERT 2010 draft programme Favoured themes for 2010 • Asset strategies • How to embed Continuous Improvement and get people involved at all levels – Hartlepool TMD??? • Competency from engineers to shop floor operations and suppliers, models and mechanisms • Lean suppliers and replenishment of stocks and spares • Lean PTW process (RAP) • Visits to Grimsby and SABIC PE plant Wilton

  3. Possible topics PLUS……

  4. Process Excellence agenda ideas • Half day workshops to focus on members’ particular problems • Effective multi organisational processes • Productive relationships with contractors • CI Deployment Healthchecks • ?? • Training inputs on selected topics • Embedding lean in an Organisation • When to twiddle the knobs • Visual factory • Guest speakers • BQF

More Related