An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cryo Operations 1-31-12 Trouble Report #013120120730  Liquid helium level probe was falsely indicating high level, which drove the JT valve closed and actual level went to zero causing high magnet temperatures and the need to stop beam. Still investigating, possibly a bad channel on an analog input card. 10:00 Yellow Power Leads icing up Verified heater is functioning and no helium leaks. Next step is to re-zero lead flow controllers which can only be done at zero current. Will monitor the icing and hopefully wait until next maintenance to recalibrate. AGS COLD SNAKE Refilled 1 week ago at noon, on Jan 24. Increased operating pressure by 1 psi. Level probes are not as reliable at higher pressure, so we are closely watching temperatures on the junctions between SC leads and HTS lead (7.8K)

More Related