1 / 3

Chapter 10. NSTX-U Facility Status and Proposed Upgrades

Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except few sections, References to be added. 10.1. Abstract 10.2. Facility / Diagnostic Overview 10.3. Upgrade Project Status and Plan 10.3.1. New Center Stack Upgrade

Download Presentation

Chapter 10. NSTX-U Facility Status and Proposed Upgrades

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except few sections, References to be added • 10.1. Abstract • 10.2. Facility / Diagnostic Overview • 10.3. Upgrade Project Status and Plan • 10.3.1. New Center Stack Upgrade • 10.3.2. Second Neutral Beam Injection System Upgrade • 10.3.3. NSTX-U Facility Subsystems • 10.3.3.1. Rectifier Control Refurbishments • 10.3.3.2. Poloidal Field Coil Power Supply Upgrades • 10.3.3.3. Migrate Plasma Control System to Modern Processors • 10.4. RF Heating and Current Drive Systems • 10.4.1. HHFW and upgrades • 10.4.2. 28GHz ECH/EBW system • 10.5.1. Macro-stability Tools • 10.5.1.1. 2nd SPA • 10.5.1.2. NCC (Waiting input from Steve and Jack) • 10.5.1.3. Massive Gas Injection • 10.5.2. Boundary Physics Tools • 10.5.2.1. Divertor Cryo-pump (Updated figure is needed) • 10.5.2.2. EHO antenna • 10.5.2.3. Fueling tools, real-time density diagnostics • 10.5.2.4. Lithium Granules Injector for ELM control • 10.5.2.5. Upgraded lithium coating systems (Need updated description – Lane will provide input today • 10.5.2.6. High-Z metallic divertor – Strategy needed – Moly tile installation postponed • 10.5.2.7. High-Z outer and inner wall PFCs – Strategy needed

  2. Chapter 10. NSTX-U Facility Status and Proposed Upgrades Masa Ono, Gerhardt, Kaita, Stratton, TSG leaders, Engineering • 10.5.2.8. Flowing liquid lithium divertor/module • 10.5.2.9. Laboratorie for Material Characterization and Surface Chemistry • 10.5.3. Start-up and Ramp-up • 10.5.3.1. CHI upgrades • 10.5.3.2. Plasma Gun Start-up (Waiting for Pegasus input) • 10.6. NSTX-U Diagnostic System Status and Plans • 10.6.1. Profile Diagnostics • 10.6.1.1 Multi-pulse Thomson Scattering Upgrade • 10.6.1.2 Charge-Exchange Recombination Spectroscopy • 10.6.1.3 Soft X-ray Spectroscopy / Tomography • 10.6.1.5. Motional Stark Effect – Laser Induced Fluorescence • 10.6.2. Turbulence Diagnostics • 10.6.2.1. High-k Scattering System • 10.6.2.2. Beam Emission Spectroscopy • 10.6.3. MHD Diagnostics • 10.6.3.1. Real-Time Velocity Diagnostic • 10.6.3.2. Real-Time MSE • 10.6.3.3. Real-Time Thomson Scattering • 10.6.4. Boundary Physics Diagnostics • 10.6.4.1. Material Analysis Particle Probe (MAPP) • 10.6.4.2. Divertor Spectrometers • 10.6.4.3. Divertor Thomson Scattering • 10.6.4.4. Dust Detector and Quartz Microbalances

  3. Chapter 10. NSTX-U Facility Status and Proposed Upgrades Masa Ono, Gerhardt, Kaita, Stratton, TSG leaders, Engineering • 10.6.5. Energetic Particle Diagnostics • 10.6.5.1. Energetic Particle Distribution Diagnostics • 10.6.5.2. Energetic Particle Modes Diagnostics • 10.6.5.3. Energetic Particle Modes Antenna • 10.6.6. Wave Diagnostics (Need input, incorporate into RF section? ) • 10.6.7. Start-up, ramp-up, and sustainment diagnostics (Not quite sure if we need this section?) • 10.8. NSTX-U Facility Utilization

More Related