1 / 17

Communicating Benefits and Metrics for Height Modernization Program

Learn about success stories and examples of the Height Modernization Program, including impactful anecdotes, case studies, and significant events like ship incidents and bridge clearances. Explore the importance of national elevation data assessments and the challenges facing the program amidst funding constraints and state budget issues.

Download Presentation

Communicating Benefits and Metrics for Height Modernization Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Illinois Height Modernization ProgramCommunicatingBenefits and Metricsfor Height Modernization Efforts. Sheena K. Beaverson

  2. Benefits and Metrics • Introduction • Anecdotes • Case Histories and Examples • 2012 ESRI Map Gallery Display • Great Lakes Region Height Mod Consortium meeting in Fall, 2012

  3. Benefits and Metrics • £1bn cruise liner squeezes under bridge... with just '1.5 inches' to spare 31 October 2010 • About 20in clearance … weather conditions brought margin of error down to 1.5inhttp://www.dailymail.co.uk/news/article-1325198/Cruise-liner-squeezes-bridge-just-1-5-inches-spare.html

  4. Benefits and Metrics • Ship carrying rocket parts hits Kentucky bridge • “Two spans of the Eggner Ferry Bridge … were destroyed Thursday night by the Delta Mariner, which was too tall to pass beneath the structure.” • http://www.nbcnews.com/id/46164194/ns/us_news-life/1/27/2012

  5. Benefits and Metrics • Tower Bridge forced to open for 50 foot rubber duck. Wed 12 Dec 2012 • http://www.itv.com/news/london/2012-12-11/london-bridge-forced-to-open-for-50-foot-rubber-duck/

  6. Benefits and Metrics • 3D Elevation Program: Case Histories • http://nationalmap.gov/3DEP/ • FEMA expects that … program could reduce the amount of time needed to update its flood maps. • USGS discovered a surface rupture which led to a redesign of a $735-million suspension bridge across the Tacoma Narrows. • The value to America's farmers of public domain lidar for precision agriculture is estimated to be $2 billion annually.

  7. Benefits and Metrics • National Enhanced Elevation Assessment • “Elevation data are essential for flood mitigation, conservation management, infrastructure development, national security, and many other applications.” • http://pubs.usgs.gov/fs/2012/3088/pdf/fs2012-3088.pdf

  8. 2012 ESRI Map Gallery Display

  9. 2012 ESRI Map Gallery NGS poster by Christine Gallager • States Alphabetical • Height Mod grant (y/n) • Leveled Heights by state • Total Vertical Marks

  10. 2012 ESRI Map Gallery Display • A program overview seeking funding for Year 1 stated that Illinois was "in the bottom 10 states" with respect to elevation information. • From NGS poster, determined Illinois is 15th of 49 states in # of precisely leveled heights. • Reach top 10 by end of current program year.

  11. 2012 ESRI Map Gallery Display • 01 Florida 20,842 • 02 Minnesota 16,169 • 03 California 9,784 • 04 N. Carolina 8,263 • 05 Texas 6,349 • 06 S. Carolina 6,234 • 07 Michigan 5,092 • 08 South Dakota 4,643 • 09 Wisconsin 4,638 • 10 New York 3,905 • 11 Washington 3,764 • 12 Pennsylvania 3,743 • 13 Virginia 3,565 • 14 Maryland 3,496 • 15 Illinois 2,958 Bold = HM grant via NGS

  12. Benefits and Metrics • Great Lakes Region Height Mod Consortium meeting in Fall 2012 in Lansing, MI. • Survey Data Statistics discussion at regional business meeting, NGS staff not present. • National metrics • State metrics

  13. Discussion

  14. Discussion Notes

  15. Height Modernization Challenges • Maintain momentum • Aggressive goals require staff, hardware, software. • Future funding • NGS funding for HM not currently an option. • SPR funding is limited in duration. • State budget situations are dire.

More Related