ILCTA_MDB HTS Update

ILCTA_MDB HTS Update. Andy Hocker 31-AUG-2006. Cryostat arrived at MDB 12-JUL. Since then…. Cryostat leak-checked by TD T&I mechanical techs Cryostat support frame moved into cave Needed fixes identified New rupture disc Heat leak Cryostat safety document written

joshua-cruz
Download Presentation

ILCTA_MDB HTS Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILCTA_MDB HTS Update Andy Hocker 31-AUG-2006

  2. Cryostat arrived at MDB 12-JUL A. Hocker, ILCTA Meeting

  3. Since then… • Cryostat leak-checked by TD T&I mechanical techs • Cryostat support frame moved into cave • Needed fixes identified • New rupture disc • Heat leak • Cryostat safety document written • LL dewar design sent to MS for fabrication 4 K 2 K 4 K A. Hocker, ILCTA Meeting

  4. To do • Install/leak check new rupture disc • Install insulating shims around pipes • Install/leak check LL dewar and piping • Dummy load for commissioning • Move cryostat into MDB cave • Problem: nobody available in TD to do this for ~3 weeks • T&I mechanical group are swamped with magnet work • Not likely to provide any continued support • So, what to do? • AD will be working on instrumentation infrastructure in meantime A. Hocker, ILCTA Meeting

  5. Milestones • 20-SEP: All parts in hand/tech help available • 29-SEP: Cryostat work finished • 6-OCT: Cryostat installed in MDB cave and connected to feedbox • 13-OCT: Safety review • 20-OCT: Dummy load cooled to 1.8 K Ready to accept a cavity A. Hocker, ILCTA Meeting

  6. Misc. • 3 dressed cavities from DESY to arrive in ~3 weeks? • We get one • Will need an engineering document, I’m told • AD guys were procuring cavity/coupler clean vacuum carts --- need to follow up • Good progress at CC2 reading out coupler data via EPICS, using it to control synthesizer • First step in automation (and datalogging) A. Hocker, ILCTA Meeting

  7. HTS has an e-log Get a password from Michele McCusker (mccusker@fnal.gov) E-log tutorial from Suzanne Gysin today at 15:30, here A. Hocker, ILCTA Meeting