1 / 3

Highlights of changes to Subpart E

Highlights of changes to Subpart E. Based on results from JAA/FAA harmonisation FAA about to amend TERPS & Opspec req Participation by FAA, JAA/NAAs, IFALPA, AEA, AIA, AECMA, ERA, OPS/AIR/PROC-specialists Introducing stabilised approach concept from ALAR/CFIT programme ACJ gives the details

jovan
Download Presentation

Highlights of changes to Subpart E

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Highlights of changes to Subpart E • Based on results from JAA/FAA harmonisation • FAA about to amend TERPS & Opspec req • Participation by FAA, JAA/NAAs, IFALPA, AEA, AIA, AECMA, ERA, OPS/AIR/PROC-specialists • Introducing stabilised approach concept from ALAR/CFIT programme • ACJ gives the details • Compliant with ICAO standards • MDA/H vs. DA/H is kept open for NAAs and operators to agree i.a.w. JAR-OPS 1.430 (a) • OCP and OPSP working on the MDH/DH business 3 March 2004

  2. Highlights of changes to Subpart E (2) • The concept of CDFA ( Continuous Descent Final Apch) • Includes SAp (stabilised in terms of configuration/energy) • Includes a number of conditions • Includes the majority types of NPAs • Minima based on a concept/formulae: RVR = HAT/tg x (apch slope angle) - length of apch lights • Single table minima for Cat I/APV/NPA • Some changes of system minima, e.g. NDB raised to 350 ft • Lowest RVR of 550 m is kept, but use of RVR < 750 m is subject to some conditions, like use of A/P, F/D, HUD, etc 3 March 2004

  3. Highlights of changes to Subpart E (3) • Stabilised approach mandated immediately • 3 years implementation period proposed for new operating minima due to OM & training issues • Penalties in RVR suggested until flying continuous descent final approaches • Allowing for new technology, e.g. HUD, GLS • Some alleviations for qualification of Cat III operations in relation to aeroplane/runway combinations • Some alleviations in Cat II/III training/qualification i.a.w. an OPS/FCL workshop results 3 March 2004

More Related