1 / 6

Technical Analysis of Commissioning, Infection Control Risk Assessment, and Constructability in Healthcare Construction

This thesis presentation by Devin Learn, a construction management expert, focuses on analyzing the effectiveness of commissioning, infection control risk assessment, and constructability in healthcare construction projects, particularly in Lancaster General Hospital's 5th & 6th floor fit-out and cardiac elevator in Lancaster, Pennsylvania. The presentation will review existing literature, determine benefits and decision-making processes, catalog research information, identify locations and types of assemblies, and explore alternate methods of construction.

jsaucedo
Download Presentation

Technical Analysis of Commissioning, Infection Control Risk Assessment, and Constructability in Healthcare Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thesis Presentation Devin Learn Construction Management Dr. Messner Lancaster General Hospital 5th & 6th Floor Fit-Out, Cardiac Elevator Lancaster, Pennsylvania 11/29/06

  2. Analysis #1: Commissioning This technical analysis will look at the effectiveness of commissioning on fit-out type construction projects focusing on healthcare/hospital facilities. In order to conduct this research the following steps should be used. • Review existing literature on commissioning of healthcare/hospital facilities. • Determine benefits and decision making process of commissioning. • Catalog research information into decision making matrix.

  3. Analysis #2: Infection Control Risk Assessment This technical analysis will look at the importance of infection control risk assessment focusing on sequencing and schedule reduction. In order to conduct this research the following steps should be used. • Review literature on infection control risk assessment and requirements for healthcare/hospital facilities. • Determine locations and types of assemblies that will be used to satisfy these requirements. • Identify sequence of work that will require the least amount of rework or movement of these assemblies to complete the project with the least amount of risk.

  4. Analysis #3: Constructability This technical analysis will look at the constructability issues of the cardiac elevator addition in an isolated site within the hospital complex. In order to conduct this research the following steps should be used. • Identify constructability issues for the cardiac elevator addition. • Research alternate methods of construction.