EMC Status Report: December 2003

EMC Status Report: December 2003. Run 4 data is fine. Now have 4 dead /noisy ADBs – fix 3 over Xmas. New Neutron generator is here. It works. It’s paid for. Source calibration takes  30’ Go to calibration every few weeks using naturally occurring down times. Worries Chiller

Download Presentation

EMC Status Report: December 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMC Status Report: December 2003 Run 4 data is fine Now have 4 dead /noisy ADBs – fix 3 over Xmas • New Neutron generator is here. It works. It’s paid for. • Source calibration takes  30’ • Go to calibration every few weeks using naturally occurring down times • Worries • Chiller • LV PS crates • Light Pulser used without airconditioning in cabinets (instability) for detecting dead readout in global detector calibration and independently by EMC. New units on order, here December 12th for installation over shutdown Trickle ~ OK

More Related