EMC Status Report: December 2003. Run 4 data is fine. Now have 4 dead /noisy ADBs – fix 3 over Xmas. New Neutron generator is here. It works. It’s paid for. Source calibration takes 30’ Go to calibration every few weeks using naturally occurring down times. Worries Chiller
E N D
EMC Status Report: December 2003 Run 4 data is fine Now have 4 dead /noisy ADBs – fix 3 over Xmas • New Neutron generator is here. It works. It’s paid for. • Source calibration takes 30’ • Go to calibration every few weeks using naturally occurring down times • Worries • Chiller • LV PS crates • Light Pulser used without airconditioning in cabinets (instability) for detecting dead readout in global detector calibration and independently by EMC. New units on order, here December 12th for installation over shutdown Trickle ~ OK