Salt Management Plan & Snow Disposal Facility

Salt Management Plan & Snow Disposal Facility. Presentation to Council July 13 th , 2009. Salt Management Plan – Why?. Late 90’s Environment Canada became concerned with the environmental effects of road salt

Download Presentation

Salt Management Plan & Snow Disposal Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Salt Management Plan & Snow Disposal Facility Presentation to Council July 13th, 2009

  2. Salt Management Plan – Why? • Late 90’s Environment Canada became concerned with the environmental effects of road salt • A comprehensive assessment concluded that excessive use of road salts was causing environmental damage • Also recognized that salt is critical to winter safety • Canadian Transportation sector worked with Environment Canada to develop a Canadian strategy to manage road salts • The strategy was published as Environment Canada’s Code of Practice for the Environmental Management of Road Salts (2004) • Canadian Transportation Agencies are committed to complying with this Code of Practice and developing Salt Management Plans

  3. Salt Management Plan – Key Areas of Concern? • Excessive salt use on roads and sidewalks • Particular concern around salt vulnerable areas • Storage and handling areas such as maintenance yards • Snow storage and disposal areas

  4. Salt Management Plan – Why & How? • GOAL - To maintain safe winter travel while reducing the negative environmental effects of road salt. • Comprehensive review of the City’s Winter Maintenance Program – identified areas needing improvement • Establishes a multi-year plan to improve salt management – some improvement already made. • Consistent with Environment Canada’s Code of Practice for the Environmental Management of Road Salts (2004)

  5. Salt Management Plan – Key Findings • The City’s Winter Program is good with some key areas for improvement • Staff already working on many improvements • Key areas for improvement are: • Level of Service Policy – Sidewalks • Increase use of pre-wetting • Fine-tune application rates for salt and sand/salt mix • Increase use of pavement temperatures in decision-making • Improve training & record-keeping

  6. Salt Management Plan – Two Major Areas • Upgrade Maintenance Yard • Material Storage • Drainage and washwater management • Good Housekeeping Practices • Equipment Loading • Site Logistics • Review Snow Disposal Site • Location – good and bad • Capacity concerns • Access • Drainage and meltwater management • Aesthetics

  7. SNOW DISPOSAL FACILTY (SDF) – EA STUDY • City undertook a Class EA Study to review the future status of the existing snow disposal facility on Water Street West. • The study included: • A review of possible upgrading of the existing site. • A review of potential new snow disposal site. • Consideration of alternative technologies • Followed Municipal Class EA Process, Schedule B

  8. Issues With Existing Disposal Site • Located on the City’s waterfront • May conflict with waterfront development plans • Does not include specific meltwater treatment • Discharges directly to the St. Lawrence River • One-lane bridge access deteriorating and a bottle neck • Site owned by Transport Canada • Limited capacity – Expansion opportunities restricted

  9. SDF – CLASS EA / SITE SELECTION PROCESS • Start-up Notification (newspaper ads, contacted external agencies) • Identified Potential Alternative Site Areas (see next slide) • Presented Potential Areas and screening at a Public Information Centre (PIC) - February 18, 2009 • Based on findings of screening and feedback from the PIC, two sites were identified on the short list: • Upgrade the existing site • Relocate to Site Area #7 (located at Virginia Drive) • Carried out a detailed analysis / evaluation of the short-listed sites. • Undertook additional consultation with Trans-North Pipelines, MOE, MNR and Conservation Authority. • Identified Preferred Site Area • Preparing an EA Project File and will be placing onto the public record later this summer for a 30-day review period

  10. Site Area #7 Existing Site

  11. SDF – PREFERRED SITE • Potential Site Area #7 is preferred for the following reasons: • Secures site in City’s ownership • Still close to the City’s downtown area • Sufficient capacity for the future • Greater potential for meltwater and stormwater management • Provides safe & efficient truck circulation on-site • Relocates the SDF away from residential houses on Water Street W. • Allows opportunities for future waterfront redevelopment at the existing site • Avoids the need to replace the existing bridge crossing over the Old Cornwall Canal for snow disposal operations • Has a lower construction cost: • ~$2.54 million for Potential Site Area #7 • ~$2.95 million for upgrading existing site

  12. SDF – PREFERRED SITE – CONCEPT PLAN SITE FEATURES - Meltwater Treatment – Vegetative Buffers – Dual Access – Industrial Location - Acceptable to TNPL and Raisin Region Conservation Authority

  13. Thank You QUESTIONS Salt Management Plan & Snow Disposal Facility Presentation to Council July 13th, 2009