1 / 16

Data Communications Program FAA Prototype & Validation Activities

Data Communications Program FAA Prototype & Validation Activities. Presented to: Data Comm Implementation Team By: Craig Morris Date: January 2011. Agenda. Validation of SC-214 / WG-78 services Data Comm Lab capabilities To be done / Work in progress Data Comm Lab working environment

judah
Download Presentation

Data Communications Program FAA Prototype & Validation Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Communications ProgramFAA Prototype & Validation Activities Presented to: Data Comm Implementation Team By: Craig Morris Date: January 2011

  2. Agenda Validation of SC-214 / WG-78 services Data Comm Lab capabilities To be done / Work in progress Data Comm Lab working environment THALES avionics and ground test equipment Honeywell avionics Rockwell Collins avionics FAA Tech Center ground system Data Comm Lab Architecture Prototype and Validation Roadmap 2

  3. Data Comm Lab – Validation of Services End system applications Lab Validation Capabilities Standards CM CPDLC ADS-C FIS Services Services Complete by: DLIC DLIC ACM ACM ACL ACL WP 1 Validation Capabilities June 2011 AMC AMC DCL DCL D-TAXI D-TAXI D-OTIS D-ATIS FLIPINT It is anticipated that such services will be validated by other validation projects as part of SESAR. This also holds true for the validation of D-OTIS. The time-frame for this validation will be 2013 ?? WP 2 4D-TRAD 3

  4. FAA Data Comm / Industry Partnerships (OTAs) Rockwell Collins RTCA SC-214 / EUROCAE WG-78 WP-1 avionics Honeywell RTCA SC-214 / EUROCAE WG-78 WP-1 avionics THALES RTCA SC-214 / EUROCAE WG-78 WP-1 & 2 avionics Ground System (WP-1 and WP-2) Data Comm LAB development @ Tech Center 4

  5. Data Comm LAB capabilities to Date Air / Ground VDL Mode 2 Infrastructure Air / Ground Router with Park-Air radio interface Ground / Ground Router for routing and discovery RF radio cloud Addressing Plan for end to end connectivity (routing / discovery and forwarding) CMA (end system application) Based on ICAO DOC 9880 end system requirements Based on RTCA SC-214 ATS Interop Requirements PM_CPDLC (end system application) Based on ICAO DOC 9880 integrity algorithm Based on RTCA SC-214 ATS Interop Requirements 5

  6. Data Comm LAB capabilities to Date (cont..) PM_CPDLC end system integration Integrated Tech Center CPDLC end system with both Rockwell Collins, and Honeywell CPDLC end systems Via air / ground infrastructure Developed logging and tracking database for all message exchanges at all levels of the protocol stack Developed GUI Contains the entire RTCA SC-214 / EUROCAE WG-78 message set for generation / scripting, and display of messages Developed supportive test tools under the GUI to allow for greater flexibility in decoding and encoding of messages Installed and Integrated THALES Air FANS workstation with Ground FANS workstation As an initial delivery under the OTA Supports RTCA SC-214 / EUROCAE WG-78 DCL service 6

  7. To be done / Work in progress Develop common TEST procedures / cases (in progress) Addresses the Interoperability Requirements Test procedures / cases must be common across all platforms Develop Traceability Matrix Document (in progress) Traces the Test procedures / cases with Ground System requirements, and SC-214 requirements Develop PM_FIS (end system application) (in progress) Based on ICAO DOC 9880 for technical requirements Based on RTCA SC-214 for SPR, and Interop requirements D-OTIS service under FIS (will develop D-ATIS initially for validation) Implement Link 2k+ backwards compatible requirements (in progress) As part of the ATS interop for validation Target: Jan 21, 2010 Target: Mar 24, 2011 Target: Apr 25, 2011 Target: Feb 11, 2011 7

  8. To be done / Work in progress (cont.) Implement FANS Accommodation (in progress) Based on Interop Requirements FANS Interop for validation Develop Data Comm Gateway (in progress) Supports integration of DESIREE for Data Comm outreach program Provides interface to NIEC Other interfaces (as necessary) Develop LAB Access Point with external partners EUROCONTROL Experimental Center (EEC) Oak City IFCET lab Boeing Airbus Others (as necessary) Target: Feb 18, 2011 Target: Mar 31, 2011 Target: May 27, 2011 8

  9. To be done / Work in progress (cont.) Actual Validation Conduct and Reporting (WP-1) Begin conduct January 2011 Plan quick look reports / results March 2011 Plan to submit Final report June 2011 9

  10. Thales Air and Ground System Initial delivery Included: • Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI • Dual-Stack system • ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) Planned deliveries Include: • Ground WP-1 (March 2011) • A/G DSP (March 2011) • AIR WP-1 (DCL only, May 2011) • AIR full WP-1 (June 2011) • Full WP-2 (Nov / Dec 2011) 10

  11. Thales Air/Ground – system example Initial delivery: • CMU HMI • Pre-production CMU • Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI • Dual-Stack system • ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) • Air Ground Datalink Server • and • Ground Simulator Tool • VDL/2 radio Planned deliveries: • Ground WP-1 (March 2011) • A/G DSP (March 2011) • AIR WP-1 (DCL only, May 2011) • AIR full WP-1 (June 2011) • Full WP-2 (Nov / Dec 2011) • RX/TX • Coax + Attenuators • Airborne Simulator • Data • Service • Simulator Ground Segment Simulation and Test Facility Airborne Segment Simulation and Test Facility • 11

  12. Honeywell Avionics Deliveries Included Link 2000+ (July 2010) SC-214 WP-1 (Dec 2010) CM PM_CPDLC Link 2000+ Services build WP-1 Services build Ship-sets Include: Mark II CMUs MCDUs, VDRs APMs Cockpit Printers Gables Radio Tuning Panels I/O Junction Panels 12

  13. Rockwell Collins Avionics Deliveries Included Link 2000+ (July 2010) SC-214 WP-1 (Dec 2010) • CM • PM_CPDLC • PM_FIS • Link 2000+ Services build • WP-1 Services build Ship-sets Include: CMU-900 VHF-2100 (VDRs) IDC 900 (CDU) APM-900 Junction and Tuning Panels 13

  14. Tech Center Ground System Available NOW CM PM_CPDLC WP-1 SC-214 Services Comm Infrastructure G/G routers, A/G routers VDL Mode 2 GS (park-air radios RF cloud GUI (text based) In Progress / Planning: Develop common TEST procedures / cases Develop Traceability Matrix Document Develop PM_FIS (end system application) Implement Link 2k+ backwards compatible reqs. Implement FANS Accommodation requirements Develop Data Comm Gateway (for DESIREE) Develop LAB Access Point with external partners 14

  15. 15

  16. RTCA SC-214/EUROCAE WG-78Prototype/Validation Roadmap 2009 2010 2011 2012 RTCA SC-214/EUROCAE WG-78 Green Cover FRAC process Nov 2010 Test Plan / Procedures Validation Phase – procedures and conduct WP-1, WP-2 Test Plan, procedures, scenarios Prototype & Validation Plan v1.0 (Sept 2009) Dec 2010 Test WP-1 Aug 2010 Test Syntax (all messages) June 2011 Test WP-2 Prototype & Valid Plan v2.0 (Dec 2010) Rockwell Avionics (WP-1) WP-1 services (avionics) July 2010 (Blue Label # 1) Limited Services ASN.1 Syntax Dec 2010 (Blue Label # 2) WP-1 Services Honeywell Avionics (WP-1) WP-1 services (avionics) July 2010 (Build # 1) Limited Services ASN.1 syntax Dec 2010 (Build # 2) WP-1 Services Thales Avionics (WP-1 & WP-2) May 2011 214/78 DCL ATN/FANS WP-2 (avionics) June 2011 Full WP-1 Services ATN/FANS Dec 2011 Full WP-2 Services ATN/FANS Thales Ground System (WP-1 & WP-2) WP-2 (ground system) Dec 2010 214/78 DCL ATN/FANS March 2011 Full WP-1 Services ATN/FANS Nov 2011 Full WP-2 Services ATN/FANS …….Data Comm demos/trials…..2012  Tech Center Ground system (WP-1 & WP-2) Feb 2010 (Phase 1) Initial Lab Env. WP-2 (ground system) Aug 2010 (Phase 3) Limited Services ASN.1 Syntax Dec 2010 (Phase 4) WP-1 Services Sept 2011 (Phase 5) WP-2 Services+ A/G Subnetwork May 2010 (Phase 2) Lab tools/infra 16

More Related