Discover why an oil refiner like Preem is investing in Carbon Capture technology and infrastructure, and how it aligns with their vision for a sustainable society. Learn about Preem's commitment to renewable fuels, hydrogen production, energy efficiency, and their demonstration project for carbon capture.
E N D
How come an oil refiner invest in Carbon Capture technology and infrastructure? Preem and CCS
Preem: In short ”One of Sweden’s most important energy suppliers 80% 50% 7/10 570 ofSweden’srefiningcapacity ofsupplied petroleum products in Sweden freight services in Sweden runs on Preem’s diesel service stations
Preem’sClimateFootprint Emissions by Scope Indirect emissions that occur in value chain – mainly consumption Direct emissions from owned and controlled sources Indirect emissions from the generation of purchased energy Shateof emissions by Scope
Preem’s vision The road map to a sustainable future… • 3 000 000 m3 renewablefuels by 2030 (1 500 000 m3 by 2024) • Renewable hydrogen production • Energy efficiency • CarbonCapture and Storage (CCS)
Ideal Conditions for CCS LOCATION • Deep water access in both Lysekil and Gothenburg • Proximity enables a Skagerrak cluster and CO2 HUB for efficient logistics - from capture to storage Oslo INFRASTRUCTURE Lysekil • Preem has two large Hydrogen plants at each site where CO2 concentration is high • Excess heat, high potential for energy utilization with CO2 capturing Gothenburg
Sweden’s largest demonstration project at Lysekil THE PROJECT SCOPE • Demonstration of carbon capture using Aker Solutions technology • Look into utilizing waste heat streams to reduce the primary energy requirements. • A policy and legislation review in also included in the project • Financing from both Norwegian GassNova and Swedish Energy Agency for a three year project • Demonstration of carbon capture at Lysekil’s Hydrogen Production unit, which will form the basis for a full scale carbon capture design TIMELINE COMING UP • The project started in the beginning of 2019. • The demonstration is planned for 2020, followed by project completion and reporting. • Take all learnings from this project into a pre-engineering study. This would start late 2021 / early 2022. • Final investment decision in 2022. • A CCS-plant could be ready in 2024. * Preem in collaboration with Chalmers University , SINTEF, Aker Solutions and Equinor