Work Breakdown Structure (WBS). Work Breakdown Structure. A method to organize the project total scope of work in a hierarchical structure where each level represents an increased detail of the level above it. The items at the lowest level in a WBS are referred to as Work Packages
E N D
Work Breakdown Structure • A method to organize the project total scope of work in a hierarchical structure where each level represents an increased detail of the level above it. • The items at the lowest level in a WBS are referred to as Work Packages • Work packages may be further decomposed into work activities. • The WBS is used to help in project planning and control as well as to develop a common understanding of the scope of the project.
Criteria for WBS The major components should indicate the deliverables of the project Lower level components should be measurable to allow scheduling, budgeting, and evaluating progress Breakdown must allow assignment of responsibility for work items
How to build a WBS • Begin with the Plan, focusing on Objectives and Deliverables • Break the main product(s) down into sub-products • Set the structure to match how you’ll manage the project • Lowest level not too detailed, not too large • Identify support activities • Check for completeness - is all the effort included? • Develop a coding structure if needed • Assign work package managers
Gantt chart • A Gantt chart is a type of bar chart, developed by Henry Gantt, that illustrates a project schedule. • Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.
Gantt chart Gantt chart can provide following optional information too, • Planned vs. actual view of the project • % completion of activities • Overall project progress/ status • Activities on critical path