140 likes | 301 Views
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5. Pros : No investment Avoid complicated setting Slow rate of erosion. Cons : Does not address concerns Instability remain. Do Nothing Option. Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5.
E N D
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Pros: No investment Avoid complicated setting Slow rate of erosion Cons: Does not address concerns Instability remain Do Nothing Option Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Pros: Slower rate of erosion Improve habitat Erosion concerns alleviated Low cost Cons: Several years before well established Poor soils on fan surface High plant mortality Conservation Easement Option Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Bioengineering Option Pros: • Create habitat • Bank stabilization • Demonstration value • Compatible with easement option Cons: • Expensive • Difficult to secure on high gravelly bank • Short term protection Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Channel Realignment Option Pros: • Relieve pressure on bank • Channel placed where good cover Cons: • Possible unintended consequences • Expensive • Permitting difficulties Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Remove Riprap Option Pros: • Accommodates excess sediment • Improve stability downstream • Compatible with easement option Cons: • Erosion increased • Public resistance • Remote chance of extending beyond easement Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5
Alluvial Fan Access Option Pros: • Decrease sediment supply • Relieve pressure on VT 102 • Return to more natural condition Cons: • Further assessment needed • Limited area available • Public resistance • No short term improvements Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5