80 likes | 181 Views
BSA 376 Entire Course (Uop)<br><br>For more course tutorials visit<br><br>www.tutorialoutlet.com<br> <br>BSA 376 Week 2 Individual Work-Related Project Analysis, Part I<br>BSA 376 Week 2 Team Project Draft - Riordan Manufacturing Outline<br>BSA 376 Week 3 Team Project Draft (Riordan Manufacturing)<br>BSA 376 Week 4 Team Project Draft<br>BSA 376 Week 5 SDLC Paper and Presentation
E N D
BSA 376 UOP CourseTutorial For more course tutorials visit www.tutorialoutlet.com
BSA 376 UOP CourseTutorial BSA 376 Week 2 Individual Work-Related Project Analysis, Part I For more course tutorials visit www.tutorialoutlet.com Assignment Individual Health-Care Bar Coding-Electronic Records Write a 4- to 6-page paper that analyzes a work-related project using systems analysis for a selected business system at the departmental or divisional level. · Include information-gathering techniques and design methods used in the project. · Analyze and evaluate what made the project a success or failure. This situation is used as the basis for future individual assignments. Include 3 to 4 references relevant to the assignment, in addition to readings. Format your paper consistent with APA guidelines.
BSA 376 UOP CourseTutorial BSA 376 Week 2 Team Project Draft - Riordan Manufacturing Outline For more course tutorials visit www.tutorialoutlet.com Submit Week 2 Team Project Draft to Learning Team Folder Resource: Service Request rm-002 for Riordan Manufacturing Review the Service Request rm-002 for Riordan Manufacturing. Define scope and stakeholders associated with the project. Identify preliminary assignments and tasks for each member. Create a detailed outline for each section. Draft the first 4 to 6 pages to include the following: · Statement of scope and goals o Specify what functions are included in the project. · Supporting measures for success o Specify tangible measures for determining the relative degree of success of the completed project. Measures must correlate with goals specified in the first section.
BSA 376 UOP CourseTutorial BSA 376 Week 3 Team Project Draft (Riordan Manufacturing) For more course tutorials visit www.tutorialoutlet.com Submit Week 3 Team Project Draft to Learning Team Folder Continue developing the paper to include the following: Determination of requirements Identify specific analysis methods, used to determine user needs. List of confirmed requirements Categorize each system requirement identified for last week’s assignment as mandatory or optional. Proposed system process view o Provide a flowchart of the proposed process. Functional allocation modeling o Specify how each proposed system function would be allocated in terms of required hardware, software, and Human-Computer Interface (HCI). Logical system model o Provide a high-level logical data flow diagram of the proposed system.
BSA 376 UOP CourseTutorial BSA 376 Week 3 Work Related Project Analysis Part 2 For more course tutorials visit www.tutorialoutlet.com Description: BSA 376 Week 3 Work-Related Project Analysis Part 2 With Vision Presentation
BSA 376 UOP CourseTutorial BSA 376 Week 4 Team Project Draft For more course tutorials visit www.tutorialoutlet.com Submit Week 4 Team Project Draft to Learning Team Folder Continue to draft the next 4 to 6 pages based on the following information: · Preliminary design model o Provide a diagram illustrating the overall logical information architecture. · Design trade-off approach o Specify tradeoffs between cost, schedule, and performance. A fast and inexpensive solution may not adequately address performance requirements. · Detailed design process and specifications o Specify separate recommended decisions for software design, hardware, and networks. Include a resolution of HCI considerations. · Physical system model o Illustrate recommended decisions in information architecture diagrams.
BSA 376 UOP CourseTutorial BSA 376 Week 5 SDLC Paper and Presentation For more course tutorials visit www.tutorialoutlet.com Complete the final section to include 4 to 6 pages on the following: · Testing process summary o Define a test plan or script identifying major software functionality and hardware to be tested with required outcomes. · Installation process and training plan summary o Provide a timeline identifying specific steps, including training, and related resources required to implement the recommended system. Include a narrative explanation with a discussion of effects of project constraints, such as time, conversion method, and so forth, and a description of the recommended plan. · Documentation plan summary o Specify and explain each type of documentation, which is required for ongoing technical and user support of the proposed system.