An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. September 22-23, 2011 International Workshop PPP Models and Technological Solutions for Sewage and Waste Management • Model Projects– Suggested Approach • Way Forward? by &

  2. September 22-23, 2011 International Workshop PPP Models and Technological Solutions for Sewage and Waste Management • Model Projects • Cluster of Pulp and Paper Industries in Uttarakhand and Uttar Pradesh • Tannery Effluents and Sewage Treatment in Kanpur, Uttar Pradesh • Sewage Treatment in Patna, Bihar • Sewage Treatment in Kolkata, West Bengal • Distillery Industries in Ganga Basin

  3. Ganga BasinDrainage Area of the Ganga River Covering 11 States in India (AIWFS Data)

  4. Uttarkashi Rishikesh Haridwar Garh Mukteshwar Ganga Delhi Lucknow Haryana Ram Ganga Mathura UP Agra Kali Yamuna Kanpur Gandak Rajasthan Gomti Bihar Ghagar Kosi Yamuna Ganga Ganga Patna Allahabad Banaras Son Madya Pradesh West Bengal

  5. DBFO Model for STPs Central Government State Government ULBs Service Provider / Operator Public

  6. DBFO Model for Sewage Treatment - Essential Components • The service provider/operator builds, and then maintains and operates the facility for the contract period after commissioning. • Responsibility for the arrangement of uninterrupted power supply for the facility is with the service provider/operator. • The service provider/operator and ULB will have joint rights (as stipulated in the contract) for the commercial exploitation of the products, i.e., treated water, sludge and sludge-derived products generated through sewage treatment. A special purpose vehicle (SPV) may be set up for this purpose by the service provider/operator and ULB using the PPP model. • Any treated sewage, sludge, etc. discharged from the sewage treatment facility during the contract period to be disposed of by the service provider/operator in a safe manner and as per provisions of the contract.

  7. DBFO Model for Sewage Treatment - Essential Components • The facility reverts back to the ULB after the end of the contract period unless the contract duration is extended. • Any liabilities arising out of site contamination during the construction period and contract period for operation of the facilities by the service provider/operator lie with the service provider/operator, even after conclusion of the contract period. • The facility reverts back to the ULB after the end of the contract period unless the contract duration is extended. • Any liabilities arising out of site contamination during the construction period and contract period for operation of the facilities by the service provider/operator lie with the service provider/operator, even after conclusion of the contract period.

  8. DBFO Model for Sewage Treatment - Essential Components • In this model, the income to the service provider/operator will be from two sources: • Payment made to the service provider/operator in the form of annuities. The expected amount of annual payments (for each year of operation after commissioning) will be clearly specified in the contract. However, the actual annual payments shall be linked to the quantity of treated sewage (of specified quality) produced by the service provider/operator in that year. • Profit (if any), from commercial exploitation of resources generated through sewage treatment, i.e., sale of treated water, sludge and sludge-derived products, as per provisions specified in the contract. • In return, the service provider/operator is expected to invest the entire funds required for initial creation of the sewage pumping and treatment infrastructure as per the approved DPR and also take care of operation and maintenance of the facility through the operation and maintenance contract period.

  9. DBFO Model for Industry Central Pollution control Board State Pollution Control Board Industry Service Provider / Operator Industry Association (Company Ltd)

  10. DBFO Model for Industry Clusters/Groups • Most of the ETPs perform much below the expected level and most of the times effluent discharge norms are violated. • Lack of knowledge and expertise to manage the ETPs and lack of resources and man power for enforcing the regulations and taking actions have been cited for poor performance. • In several instances causes beyond technical and financial are responsible for unabated pollution of rivers.

  11. DBFO Model for Industry Clusters/Groups • It is recommended that ETPs are planned on DBFO model with third party involvement as a company floated by the Association of Industries. The ETPs will be in the premises of the industry. Land for the ETP is to be provided by the industry. • The company will be responsible for managing the effluent recycling plants through service provider/operator using DBFO model and will receive funds in the beginning of the year from each of the industry towards supply of treated water of industrial grade produced from effluents discharged by the same industry. • The service provider/operator will get the payment based on quantity of industrial grade water produced from the effluents on monthly basis. • Renewing consent to operate the industry may be linked to deposition of funds in the accounts of the company floated by the Association.

  12. Model Project 1: Cluster of Pulp and Paper Industries in Uttarakhand and Uttar Pradesh

  13. Pollution of River Ganga: Contribution of Pulp and Paper Industries • Through Tributaries - Ram Ganga and Kali • Wastewater Discharge in Ram Ganga • Uttarakhand: 162 mld; Uttar Pradesh: 74 mld • Industrial Waste in Kali • 86 mld; 13,000 TPD BOD Load • Pulp and Paper Industries Contribution: • Through Ram Ganga Uttarakhand: 146 mld (90%); Uttar Pradesh: 39 mld (53%) • Through Kali  37 mld (43%)

  14. Gangotri Glacier Delhi Kolkata Ganga Sagar Mumbai Bay of Bengal Chennai River Ganga – Origin (Gangotri) to Destination (Ganga Sagar)

  15. Ramganga Ganga On River Ganga (Ramganga) at Kannauj Kannauj u/s (Fatehgarh) Kali Kannauj d/s (after confluence of Ramganga and Kali) On River Kali at Kannauj Kanpur u/s at Bithoor Kanpur d/s at Jajmau/Jane Kanpur u/s at Shuklaganj “Kannauj – Kanpur” Stretch

  16. Pulp and Paper Industries in Ganga Basin Clusters: • Kashipur – Thakurdwara (15+3+3+3) • Muzaffarrnagar (8+7+2+6) • Meerut (2+3+3) • Moradabad (4) • Water Consumption/Wastewater Generation is High; Not Closely Spaced; Conveyance Costs are High; CETPs are not viable options; Particularly if ZLD is to be achieved

  17. Pulp and Paper Industries in Ganga BasinPresent Status • Scale of Operation: 25 – 250 TPD • Mills with 100 TPD Producing Bleached Variety of Paper have CRP • Others making Craft Paper from Agro Residues do not have CRP • All mills have ETP  PC, AT, SC • Performance!

  18. Pulp and Paper Industries in Ganga Basin Water Requirements for Four Different Categories * as per discussions with the representatives of the pulp and paper industries

  19. Pulp and Paper Industries in Ganga Basin Typical Characteristics of Water and Wastewater * Mills are using RCF only at present

  20. Pulp and Paper Industries in Ganga Basin Estimated Capital and Operation and Maintenance Costs for ETPs Note: Actual cost will be technology and location specific

  21. Pulp and Paper Industries in Ganga Basin Estimated Production Cost and Selling Price for Different Grades of Paper

  22. Pulp and Paper Industries in Ganga Basin Estimated cost of Water Reuse/ Recycle after Tertiary Treatment in a Typical Mill of Capacity 25 TPD Paper and Pulp Mill # Considering 25 and 55 m3/T paper without and with RO treatment respectively; $ Considering 15 and 30 m3/T paper without and with RO treatment respectively; Cost of recovery of solids from RO Reject on drying is included in the RO treatment

  23. Pulp and Paper Industries in Ganga Basin Estimated cost of Water Reuse/ Recycle after Tertiary Treatment in a Typical Mill of Capacity 25 TPD Paper and Pulp Mill *Considering RO treatment; Cost of recovery of solids from RO Reject on drying is included in the RO treatment

  24. Pulp and Paper Industries in Ganga BasinRecommendations: B1 and B2 Categories • Increase in average production cost for B1 and B2 categories of industry is in the range of 4 – 6 %. • The cost of tertiary treatment of the trade effluent is not prohibitive and is technically feasible. • Achieving zero liquid discharge implies only an increase in cost of the paper production by a few percent of the production cost for B1 and B2 category of industry and must be enforced to save the precious resources like river Ganga in particular and Ganga system in particular. • The implementation of this may result in slight reduction in profit margin or alternatively the cost will be passed on to the consumers. • Thus it is strongly recommended that the “polluter pays principle” must be strongly adhered to achieve zero discharge paradigm in case of the pulp and paper industries. • This will immensely help saving the rivers, in particular the river Ganga, from adverse impacts without significant impact on the industry or economy or employment opportunities.

  25. Pulp and Paper Industries in Ganga BasinRecommendations: A1 and A2 Categories • Increase in average production cost for A1 and A2 categories of industry to attain zero discharge paradigm is in the range of 17-19 %. • This is on the higher side. • However, in the nations’ larger interest zero discharge paradigm must be enforced to protect rivers like Ganga, and the Ganga system. • At the same time these category of industry are important from several considerations including utilization of renewable agro based residues that will otherwise be burnt and create air pollution problems. • Hence closure of these types of industry is not in the larger interest.

  26. Pulp and Paper Industries in Ganga BasinRecommendations: DBO Model for ETPs • The past experiences reveal that most of the ETPs perform much bellow the expected level and most of the times effluent discharge norms are violated. • Number of reasons, including lack of knowledge and expertise to manage the ETPs, has been cited by the industry for poor performance. • Also the regulating agencies, such as State Pollution Control Boards (SPCBs), have cited many reasons including lack of resources and man power for enforcing the regulations and taking actions for unabated pollution of rivers due to discharge of industrial effluents. • In several instances, as shown in the case of pulp and paper industries, causes beyond technical and financial are responsible for unabated pollution of rivers.

  27. Pulp and Paper Industries in Ganga BasinRecommendations: DBO Model for ETPs • Experience with other industrial sectors, particularly in water scarce areas, suggests that third party involvement and ETPs producing industrial grade water have been performing well. • As such it is recommended that ETPs are planned on design, build and operate (DBO) model with the involvement of a company floated by the Association of Industries. • This company will be responsible for managing the effluent recycling plants through service provider using DBO model and will receive funds in the beginning of the year from each of the industry towards supply of treated water of industrial grade produced from effluents discharged by the same industry. • The ETPs will be in the premises of the industry. Land for the ETP is to be provided by the industry. The service provider will get the payment based on quantity of industrial grade water produced from the effluents on monthly basis. • Consent to operate the industry is to be given only upon deposition of funds in the accounts of the company floated by the Association of Industries by the member industries.

  28. Pulp and Paper Industries in Ganga BasinHighlights • Pulp and Paper Industries, both agro and RCF based, are important for growth and development. • Shifting towards zero liquid discharge paradigm is feasible and must be implemented to save rivers and help maintain “Nirmal and AviralDhara”. • Improvements in technology and following best practices can lead to substantial reduction in water consumption and lower the cost of attaining zero discharge paradigm. • Black liquor from agro based pulp and paper industries must be sent to CCRP for smaller units (< 100 TPD). Larger units may be allowed to have their own CRP.

  29. Pulp and Paper Industries in Ganga BasinHighlights • ETPs must be upgraded to tertiary level treatment. Some or all, depending on requirement, tertiary treated water may have to be treated using RO. • The cost of treatment up to tertiary treatment including RO treatment may increase the production cost only by 4-6 % for RCF based industries and must be enforced. • The cost of treatment up to tertiary treatment including RO treatment may increase the production cost by 17-19 % for agro based industries, but also must be enforced. However, some concessions may be offered to promote agro based industries. • CETPs do not appear to be viable for Pulp and Paper Industries in the identified clusters in the Ganga River Basin. However, all ETPs are to be managed by a company formed by association of industries.

  30. Pulp and Paper Industries in Ganga BasinHighlights • Consent to operate the industry is to be given only on annual advance payment to the company for producing industry grade water by operating state-of-the-art ETP in each industry. • DBO model is to be applied for all ETPs. Service provider is to be selected by the company and paid on the basis of quantity of industry grade water produced from the effluents. • Flow meters to be installed at the inlet and outlet of each ETP. • Industries are allowed to take fresh water only to make up for the losses due to evaporation, minor leakages, etc.

  31. Model Project 2: Tannery Effluents and Sewage Treatment in Kanpur, Uttar Pradesh

  32. Typical City / Town GangaRiver Pandu River GangaRiver

  33. Different aspects of Upgradation of Tanneries CETP @ Jajmau, Kanpur – IL&FS Study • There are 418 tanneries in Jajmau, the total installed capacity is 39270 hides per day. • Average capacity to process number of hides in all tanneries in Jajmau area (operational and temporarily closed) is anywhere between 20000 to 30000 hides per day with average weight of hide of about 28 kgs. • About 1400 liters of water is consumed per hide in processing from raw to finish. Corresponding estimated effluent quantity would be 24 to 28 MLD.

  34. Different aspects of Upgradation of Tanneries CETP @ Jajmau, Kanpur – IL&FS Study • Jajmau is mixed agglomeration of tanneries, houses, shops and other commercial establishments in a very intricate fashion. • About 4-8 MLD sewage is expected to get mixed with effluent. Thus design flow for the plant is estimated to be 32 MLD.

  35. Costs Involved in the Tanning Process

  36. Different aspects of Upgradation of Tanneries CETP @ Jajmau, Kanpur – IL&FS Study Characteristics of Tannery Effluents to be Received at CETP in Jajmau, Kanpur All values in mg/l except pH

  37. Different aspects of Upgradation of Tanneries CETP @ Jajmau, Kanpur – IL&FS Study • Industries agree to constitute a special purpose vehicle (SPV) for implementing the project. • SPV will be responsible for operating and maintaining all components of the up-graded CETP and to meet the discharge norms stipulated from time to time.

  38. Tannery Wastewater Treatment: Desired Features The desired features in any renovated tannery wastewater facility proposed for the Jajmau area in future are the following: • The portion of wastewater from tanneries containing high concentrations of chromium should be conveyed to a chrome recovery plant. The recovered chrome and other solid residues from the chrome recovery plant must be reused or disposed in a hazardous waste landfill. Effluent from the chrome recovery plant to be sent to the CETP for further treatment. • The remaining tannery wastewater must be screened for removal of large objects at the tannery premises itself, before discharge into the tannery wastewater conveyance system.

  39. Tannery Wastewater Treatment: Desired Features • Treated tannery wastewater to be reused / recycled in the tanneries, such that the freshwater requirement in tanneries is reduced. • No direct use of treated tannery effluent for sewage farming. Direct discharge of treated tannery wastewater into the river Ganga is not allowed. • Tannery wastewater in the conveyance system must be screened again before being pumped through rising mains to the CETP. • CETP to be designed for the treatment of tannery wastewater to tertiary levels. • The tertiary treated wastewater may be diluted with treated domestic sewage for reduction of TDS, and/or other advanced processes (e.g., RO with suitable reject management) must be incorporated for reduction in TDS concentration.

  40. Comprehensive Cost of Wastewater Treatment per Buffalo Hide as per ZLD Concept

  41. Sewage Treatment in Kanpur, UP

  42. Model Project 3: Sewage Treatment in Patna, Bihar

  43. Summary of Information on Sewage Treatment Plants in Patna, Bihar Total WW Generation: 143 MLD Total STP Capacity (installed): 110 MLD Utilized Capacity : 49 MLD

  44. Summary of Information on Sewage Treatment Plants in Patna, Bihar

  45. Spatial Distribution of STPs in Patna, Bihar

  46. Model Project 4: Sewage Treatment in Kolkata, West Bengal

  47. Summary of Information on Sewage Treatment Plants in Kolkata City, West Bengal Total WW Generation: 618 MLD Total STP Capacity (installed): 127.5 MLD Utilized Capacity : 50 - 55 MLD

  48. Model Project 5: Distillery Industries in Ganga Basin

  49. Estimated Pollution Load from Distilleries in the States of Gangetic Planes

  50. Spatial Distribution of Sugar and Distillery Industries in the Ganga Basin