1 / 12

US CLIVAR: MJO WORKING GROUP

Enhance model representations and forecasts of the MJO through coordinated research, data analysis, and metric development. Collaborative efforts with international agencies to improve subseasonal predictions.

Download Presentation

US CLIVAR: MJO WORKING GROUP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US CLIVAR: MJO WORKING GROUP Duane Waliser, co-chair Wanqui Wang Ken Sperber, co-chair Chidong Zhang Siegfried Schubert 2-Yr LifetimeMitch Moncrieff Klaus Weickmann April 2006-> Eric Maloney Bin Wang Leo Donner Additional/International: F. Vitart, S. Woolnough*, H. Hendon*, W. Higgins, J. Gottschalck, W. Stern * International CLIVAR Support • Terms of Reference • Develop a set of metrics to be used for assessing MJO simulation fidelity and forecast skill. • Develop and coordinate model simulation and prediction experiments, in conjunction with model-data comparisons, which are designed to better understand the MJO and improve our model representations and forecasts of the MJO. • Raise awareness of the potential utility of subseasonal and MJO forecasts in the context of the seamless suite of predictions. • Help to coordinate MJO-related activities between national and international agencies and associated programmatic activities. • Provide guidance to US CLIVAR and Interagency Group (IAG) on where additional modeling, analysis or observational resources are needed.

  2. US CLIVAR: MJO WORKING GROUP Near-Term Goals (~ 1+ YEAR) Develop (w/ C. Stephens) MJO WG Web Site. Metrics for Assessing/Diagnosing Model Simulations of the MJO. Prediction Targets and Metrics for MJO Forecasts. Using the Above, Develop an Experimental/ Diagnostics Theme for Modeling/Predicting the MJO in Conjunction With a Workshop.

  3. US CLIVAR: MJO WORKING GROUP AGU Session Subseasonal Working Group ** Meeting ** WCRP/Thorpex Trieste Convection NCAR/TIIMES Retreat Convection Monsoon Related AAMP/ Plans 2007 WGNE Systematic Errors Time Line of Activities

  4. Web Site Resources

  5. Web Site Resources

  6. MJO Weather-Climate Theme Pages

  7. Web Site Resources Expected Additions Extreme Precip Events Asian Monsoon N. American Monsoon Australian Monsoon Mid-Lat Weather Forecast Skill Angular Momentum (LOD) Africa Impacts

  8. Web Site Resources

  9. MJO Simulation Metrics Diagnostic Measures / Metrics Based on Observations for Assessing - and Possibly Diagnosing - Model Simulation Fidelity of the MJO • Observations: Satellite and/or Global Reanalysis Fields • Satellite: OLR, CMAP, TRMM, Surface Flux Products • NCEP/NCAR, ERA-40, JRA-25 • Basic Quantities: OLR, Precip, U850, U200 • Higher Level: 3D structures, Surface Fluxes, Diabatic Terms • Simple / Novice Measures -> Complex / Expert Measures • Simple : Variance Maps, Spectra, EOFs of Basic Quantities • Higher Level : Wave-Freq, Combined EOF, Life-Cycle Composites • Fluxes, Diabatic Terms, Vertical Structure • Mean States and Interannual Variability • Dissemination • Post calculated metrics from observations on web site, including likely the data in its final/metric form and maybe example code where possible. • Apply to a couple models and include results on web site. • Journal Article? • Apply to models for presentation/discussion at proposed workshop. Expect? to be here by Dec

  10. MJO Forecast Metrics Metrics to Assess in Common Terms MJO Forecast Skill/Predictability and Prediction Targets Focused on Users and Applications • Similar Considerations as with Simulations Metrics • Connect to the Simulation Metrics As Much as Possible • Real-time Constraints Introduce Challenges in Identifying the MJO • Less Groundwork to Rely On - Will Need to Entrain Operational Weather and Seasonal Forecast Expertise. • Dissemination - Similar to Simulation Metrics Expect? to be here by Next Summer

  11. Proposed Workshop Theme New Thinking, Tools & Resources for Assessing & Improving the MJO • New Thinking: • Multi-scale structure, Emphasis on Vertical Structure Analysis, Utility of Forecast Framework, A Bridge Between Weather-Climate • New Tools & Resources: • New Era of Satellite Observations, GOOS/IO Array, Multi-Scale Modeling. • Principle Focus Areas: ----> Metrics Application & Vertical Structure -> -> Experimental Framework for Multi-Scale Models ---> -> Experimental Framework for Forecast Experiments --->

  12. US CLIVAR: MJO WORKING GROUP AGU Session Subseasonal Working Group ** Meeting ** WCRP/Thorpex Trieste Convection NCAR/TIIMES Retreat Convection Monsoon Related AAMP/ Plans 2007 WGNE Systematic Errors Time Line of Activities

More Related