Test4Direct is furnishing you with the Network Appliance NS0-506 confirmed PDF question and answers. Preparing yourself for the Network Appliance NS0-506 exam enables you to pass your exam in first strive. You can save your effort, time and money because Test4Direct is providing you PDF question and answers which totally simulates with the actual NS0-506 NetApp Certified Implementation Engineer - SAN, Clustered Data ONTAP exam. Test4Direct provide you 90 days free updates related to the Network Appliance NS0-506 exam. We are also Providing you the free demo of NS0-506 exam product and highly recommend you to download free demo before purchasing the Network Appliance NS0-506 product. To view the details of money back guarantee policy and discount offers please visit the http://www.test4direct.com/NS0-506.html

Download Presentation

Network Appliance NS0-506 Exam - Updated Questions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clustered Data ONTAP NS0-506 NetApp Certified Implementation Engineer - SAN Demo Product To Buy Full Set of Exam Questions, Visit: http://www.test4direct.com/NS0-506.html

  2. Version: 7.0 Question: 1 On a FAS8040, which port is used for FCoE connections? A. e0M B. e0P C. 0a D. e0h Answer: D Question: 2 Click the Exhibit button. Referring to the diagram shown in the exhibit, what will happen if PDU-B fails? A. Both Node A and Node B will remain online and all disk shelves will remain online. B. Both Node A and Node B will remain online, but all disk shelves will immediately lose power and become inaccessible. C. Both Node A and Node B will immediately lose power and become inaccessible. D. Node A will immediately lose power and become inaccessible. Node B will remain online.

  3. Answer: A Question: 3 Hosts and switches are connected to a FAS8040. Multiple FC-enabled SVMs have been created, and LUNs have been mapped to multiple hosts. During failover testing, one of the hosts lost connectivity to its LUNs. What needs to be examined? A.FAS8040 ALUA configuration B.host multipath settings C.xhost iSCSI timeout values D. switch NPIV settings Answer: A Question: 4 Click the Exhibit button. Based on the exhibit, you are configuring a 4-node cluster with an iSCSI LIF ob each node. You connect using the first LIF from a Windows Server 2012 host. How would you add the other three LIFs?

  4. A. Use the MCS button. B. Use the Devices button. C. Use the Add session button. D. Wait and then press the Refresh button until the other sessions appear. Answer: C Question: 5 You have a 4-node FAS8040 cluster licensed for FCP and iSCSI. Each node has both FC and iSCSI LIFs. One of your Windows 2012 Servers has a single 8Gb FC port and a single 10 Gb Ethernet port with switched connectivity to the FC and Ethernet ports on the cluster. You need to use both ports on the host for multipath access to a LUN on the NetApp cluster. What will accomplish this task? A.NetApp Data ONTAP DSM for Windows MPIO B.FCoE HBA C. iSCSI HBA D. native Windows MPIO Answer: A Question: 6 A customer has a clustered Data ONTAP solution and needs to connect several Windows 2012 servers using iSCSI for LUN access. Before the LUN can be seen, what must be configured on the host? A. the LUN partitioning B. the Host Utilities Kit C. the iSCSI software initiator D. the HBA queue depth Answer: B Question: 7 You have executed the following FC configuration workflow: 1. Verify IMT supported configuration. 2. Install VSC for VMware vSphere on a Windows Server. 3. Add the storage cluster to VSC and set recommended values. 4. Update host HBA firmware and BIOS. 5. Provision the LUN. 6. Manually create an igroup and add the host WWPNs into it. 7. Map the LUN to the igroup. 8. Create datastore and its containing LUNS and volumes. In step 8, you are not able to see the LUNs you provisioned on your storage controller. When you run igroup show you see the ESX host’s initiators; however, they are listed “not logged in”.

  5. What is the problem? A. You need to configure ALUA B. The LUN was not put online. C.The LUN type is not set to type VMware. D. You need to configure zoning. Answer: D

  6. THANKS FOR TRYING THE DEMO OF OUR PRODUCT Visit Our Site to Purchase the Full Set of Actual NS0-506 Exam Questions With Answers. http://www.test4direct.com/NS0-506.html We Also Provide Practice Exam Software That Simulates Real Exam Environment And Has Many Self-Assessment Features. Download Free Product Demo From: http://www.test4direct.com/NS0-506.html Money Back Guarantee Check Out Our Customer Testimonials