An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AAs in PEPJan Geralt Bij de Vaate

  2. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction AA-mid part of the Advanced Instrumentation Program (AIP) 2012-2016

  3. Allocation of Requirements from System to Element level System Level (SPDO/SPO) System RR • 1st allocation is science requirements, operations requirements (Instrument Requirements Review). • Later allocations are extensibility requirements and non-functional requirements. 1 Element Level (WPCs) Element SRR 2 Pre-Stage 1

  4. Assembling Element Level RFPs for Stage 1 Work Assemble Work Package Consortia Pre-Stage 1 Planning Element 1 CoDR-SRR Work Define Top-level WBS Bid review SoW RFP Planning Element 2 CoDR-SRR Work Planning Element N CoDR-SRR Work Stage 1 Element MoAs Develop Stage 1 Legal, Bid Policy, T&C Contract Templates Apr/12 Jun/12 Nov/11

  5. AA SoW writing team

  6. AA SoW Draft WBS created SoW writing started Full draft by mid Jan.

  7. AA Consortium WP Mgt AA Consortium board System Engineering AA-low AA-mid receptor

  8. AA Consortium WP Mgt System Engineering AA-low AA-mid receptor System Design Front-end array Signal processing Verification systems Infrastructure

  9. pre Consortium • INAF • Oxford University • Manchester University • Cambridge University • Obs Paris (Nancay) / Univ. of Bordeaux • ICRAR • Raman Research Institute • ASTRON • Aperture Array Design and Construction Consortium: AADC2..?

  10. Consortium Stage 2 ? -IP issues -Funding/budgets Stage 1 ? Work package Consortium Work package Consortium Participating Org Participating Orgs Participating Org Industry Industry Industry

  11. Pre Consortium • Telecons and meeting in Perth (Aug/Sept 2011) • This Friday focus on AA-mid • Meeting in Manchester during/after the SPO gathering • Second half of 30th Jan- 3rd Feb week • Letter of Intend proposal drafted • Composing the bid on AA work package April/May 2012 • Start 1st July 2012

  12. General AAVS Schedule AA-low Small array demonstrators AAVS0 2011 Technology demonstrator AAVS1 2013 SKA1 full pre-production prototype array AAVS2 2015 SKA1 manufacturing data package 2016 AA-mid Individual tile demonstrators AAVS0 2011 Single array performance demonstrator AAVS1 2013 Multi-array interferometer performance demonstrator AAVS2 2016 SKA2 capable costed design 2016

  13. AA-low Demonstrators AAVS2 science capable

  14. AA-mid Demonstrators AAVS2 science capable

  15. Event list…..

  16. AAVS Funding • Self funded by the AA consortium • Material AAVS1: 1M€ • Material AAVS2: 5M€ • PEP numbers..

  17. Notes • A site decision delay impacts AAVS1/2 • SKA site needs to be ‘happy’ to host AA Verification Systems • Significant step needed from pathfinders to SKA1 • Tight schedule • Connect to deliverables of STaN, Computing and Software? • Interference with pre-cursors? • Need to tackle outstanding issues with existing team up to 1st July 2012 • AAVS0 design, build and evaluation, AA-station specification/design