AAs in PEP Jan Geralt Bij de Vaate. PEP. Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction AA-mid part of the Advanced Instrumentation Program (AIP) 2012-2016. Allocation of Requirements from System to Element level.
E N D
PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction AA-mid part of the Advanced Instrumentation Program (AIP) 2012-2016
Allocation of Requirements from System to Element level System Level (SPDO/SPO) System RR • 1st allocation is science requirements, operations requirements (Instrument Requirements Review). • Later allocations are extensibility requirements and non-functional requirements. 1 Element Level (WPCs) Element SRR 2 Pre-Stage 1
Assembling Element Level RFPs for Stage 1 Work Assemble Work Package Consortia Pre-Stage 1 Planning Element 1 CoDR-SRR Work Define Top-level WBS Bid review SoW RFP Planning Element 2 CoDR-SRR Work Planning Element N CoDR-SRR Work Stage 1 Element MoAs Develop Stage 1 Legal, Bid Policy, T&C Contract Templates Apr/12 Jun/12 Nov/11
AA SoW Draft WBS created SoW writing started Full draft by mid Jan.
AA Consortium WP Mgt AA Consortium board System Engineering AA-low AA-mid receptor
AA Consortium WP Mgt System Engineering AA-low AA-mid receptor System Design Front-end array Signal processing Verification systems Infrastructure
pre Consortium • INAF • Oxford University • Manchester University • Cambridge University • Obs Paris (Nancay) / Univ. of Bordeaux • ICRAR • Raman Research Institute • ASTRON • Aperture Array Design and Construction Consortium: AADC2..?
Consortium Stage 2 ? -IP issues -Funding/budgets Stage 1 ? Work package Consortium Work package Consortium Participating Org Participating Orgs Participating Org Industry Industry Industry
Pre Consortium • Telecons and meeting in Perth (Aug/Sept 2011) • This Friday focus on AA-mid • Meeting in Manchester during/after the SPO gathering • Second half of 30th Jan- 3rd Feb week • Letter of Intend proposal drafted • Composing the bid on AA work package April/May 2012 • Start 1st July 2012
General AAVS Schedule AA-low Small array demonstrators AAVS0 2011 Technology demonstrator AAVS1 2013 SKA1 full pre-production prototype array AAVS2 2015 SKA1 manufacturing data package 2016 AA-mid Individual tile demonstrators AAVS0 2011 Single array performance demonstrator AAVS1 2013 Multi-array interferometer performance demonstrator AAVS2 2016 SKA2 capable costed design 2016
AA-low Demonstrators AAVS2 science capable
AA-mid Demonstrators AAVS2 science capable
AAVS Funding • Self funded by the AA consortium • Material AAVS1: 1M€ • Material AAVS2: 5M€ • PEP numbers..
Notes • A site decision delay impacts AAVS1/2 • SKA site needs to be ‘happy’ to host AA Verification Systems • Significant step needed from pathfinders to SKA1 • Tight schedule • Connect to deliverables of STaN, Computing and Software? • Interference with pre-cursors? • Need to tackle outstanding issues with existing team up to 1st July 2012 • AAVS0 design, build and evaluation, AA-station specification/design