An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GreenPiezo General Presentation http://www.greenpiezo.com

  2. Table of Contents Introduction Brief History Igniter Producing Procedure A. Molding Equipments and Process B. Plastic Injection Equipments and Process C. Spring Parts Manufacturing Equipments and Process D. Head Metal Parts Manufacturing Equipments and Process E. Lead Wire Cutting Process F. Main Manufacturing Procedure Quality Inspection Equipments and Process http://www.greenpiezo.com

  3. GreenPiezo Introduction http://www.greenpiezo.com

  4. Introduction Generally, Piezo igniter units are best suited for the mechanical ignition for gas burning equipments without foreign electrical sources. Particularly, as NAMSUNG SPARK are composed with special piezo ceramic moulded in plastic or epoxy resin, our mechanical igniter have the unique feature of long durability and high output in electircal capability as well as soft operation and firmly anti-dusted type in framework. The contents of this presentation will be of interest to manufacturer and parts dealers for gas burning equipments and will assist them in making the most suitable choice and possible application of NAMSUNG SPARK - GREEN PIEZO igniter. Phone No. : 82-2-687-4734 (Republic of Korea) Fax No.: 82-2-688-5056 Point of Contact : Lyun-Do, KIM, Staff piezo@piezoigniter.com http://www.greenpiezo.com

  5. GreenPiezo Brief History http://www.greenpiezo.com

  6. Brief History Estabilished Namsungsa in Puchon Si for Infra Red Gas Burner Estabilished Namsungsa in Kwangmyung Si for Piezo ignition unit Authorized UL mark from underwriters Laboratories Inc Received an award for the export of US$ one million Authorized VDE license from Germany 1977.1 1986.11 1987.12 1996.10 2000.1 http://www.greenpiezo.com

  7. GreenPiezo Igniter Producing Procedure : A. Molding Equipments and Process http://www.greenpiezo.com

  8. A. Molding Equipments and Process (1/3) Electric Discharging Process Computer NC Milling Process

  9. A. Molding Equipments and Process (2/3) Milling Process Milling Process

  10. A. Molding Equipments and Process (3/3) Milling Process

  11. GreenPiezo Igniter Producing Procedure : B. Plastic Injection Equipments and Process http://www.greenpiezo.com

  12. B. Plastic Injection Equipments and Process (1/2) Molding Storage Plastic Injection Molding Machine

  13. B. Plastic Injection Equipments and Process (2/2) Plastic Injection Molding Machine

  14. GreenPiezo Igniter Producing Procedure : C. Spring Parts Manufacturing Equipments and Process http://www.greenpiezo.com

  15. C. Spring Parts Manufacturing Equipments and Process (1/2) Computer Spring Foaming Machine Automatic Compression Coiling Spring Machine

  16. C. Spring Parts Manufacturing Equipments and Process (2/2) Automatic Torsion Coiling Spring Machine Heating Tempering Machine

  17. GreenPiezo Igniter Producing Procedure : D. Head-Metal Parts Manufacturing Equipments and Process http://www.greenpiezo.com

  18. D. Head-Metal Part Manufacturing Equipments and Process

  19. GreenPiezo Igniter Producing Procedure : E. Lead Wire Cutting Process http://www.greenpiezo.com http://www.greenpiezo.com

  20. C. Spring Parts Manufacturing Equipments and Process (2/2) Wire Cutting and Peeling Machine Wire Cutting Machine

  21. GreenPiezo Igniter Producing Procedure : F. Main Manufacturing Procedure http://www.greenpiezo.com

  22. F.1. Assembling Equipment and Process (1/2) Insulating Oil Injection Machine Press Machine

  23. F.1. Assembling Equipment and Process (2/2) Press Machine & Insulting Oil Injection Machine Sealing Machine

  24. F.2. Epoxy Injection Process (Bonding Process) Epoxy Extrusion Process Epoxy Extrusion Process

  25. F.3. Drying Process Mechanical Convection Oven Nature-Drying

  26. F.4. Testing Process (1) Output Voltage Testing Equipment ( Oscilloscope : Iwatsu SS-5702, Divider : Iwatsu D-401)

  27. F.4. Testing Process (2) Output Voltage Testing Process

  28. F.5. Operation Testing and Packing Process (1) Operation Testing Process Operation Testing Process

  29. F.5. Operation Testing and Packing Process (2) Packing Process Automatic Bending Process

  30. GreenPiezo Quality Inspection Equipments& Process http://www.greenpiezo.com

  31. 1. Spring Part Loading Test Equipment

  32. 2. Constant Temp. & Humidity Chamber

  33. 3. Durability Testing Equipments

  34. 4. Standard Output Voltage Tester Height : 500mm Weight : 11.80g

  35. 5. Digital LCR-Meter & Super MΩ Meter Digital LCR Meter Super MΩ Meter