An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IT4005/EN Technical Specification for the Provision of Engineering Studies and Drawings, the Supply and Installation of Piping and its Accessories for Minor Works at CERN Bidders conference – 7 May 2014 Y. Body, M. Nonis / EN-CV

  2. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  3. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  4. CERN IS A GLOBAL LAB CERN was founded in 1954 as a Peace Initiative by 12 European States Today it counts 21 Member States : Austria, Belgium, Bulgaria, the Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Israel, Italy, the Netherlands, Norway, Poland, Portugal, Slovakia, Spain, Sweden, Switzerland and the United Kingdom 2300 staff physicists, engineers, technicians, administrative personnel 1000 personnel on contract 11000 users who represent more than half of the living particle physicists originating from 500 universities and institutes and of more than 80 nationalities IT4005/EN - Bidders Conference

  5. THE MISSIONS OF CERN • Push forward the frontiers of knowledge e.g. the secrets of the Big Bang … what was the matter like within the first moments of the Universe’s existence? • Develop new technologies for accelerators and detectors Information technology - the Web and the GRID Medicine - diagnosis and therapy • Train the scientists and the engineers of tomorrow • Unite people from different countries and cultures IT4005/EN - Bidders Conference

  6. The instruments used 1. Particle accelerator : Boost particles to high energies and make them collide 2. Detectors : Gigantic instruments that observe and record the results of the collisions (particle trajectories, energy, charge…) 3. Computers : Collect, store, and send around the world the big quantity of data received from the detectors for data analysis. IT4005/EN - Bidders Conference

  7. The CERN Accelerator Complex IT4005/EN - Bidders Conference

  8. Physics Beam commissioning Shutdown Tests The Long Shutdown 1 2013 2014 2015 F M A M J J A S O N D J F M A M J J A S O N D J F M A LHC SPS PS beam to beam PS Booster IT4005/EN - Bidders Conference

  9. A longer term perspective IT4005/EN - Bidders Conference

  10. Engineering Department The Engineering Department provides CERN with the Engineering Competences, Infrastructure Systems and Technical Coordination required for the design, installation, operation, maintenance and dismantling phases of the CERN accelerator complex and its experimental facilities. IT4005/EN - Bidders Conference

  11. INTRODUCTION: CERN IT4005/EN - Bidders Conference

  12. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  13. CV: The Cooling and Ventilation Group The mandate The operation and maintenance of the cooling systems, pumping stations, air conditioning installations and fluid distribution systems for the PS, SPS and LHC including their experimental areas and special cooling systems of LHC sub-detectors. It also provides service to the Computer Centre and some miscellaneous installations. IT4005/EN - Bidders Conference

  14. COOLING PLANTS Cooling towers (450 MW) 22 Chilled water station: 6-12oC (73 MW) 35 Cooling station (raw water, demineralized water, C3F8, C6F14) 150 Pipework 800 km Water distribution network: 3 stations 5'400 m3/h The water consumption of a town with 45’000 inhabitants. 10% of the consumption of the Geneva Canton IT4005/EN - Bidders Conference

  15. VENTILATION, FLUID SYSTEMS HVAC 1’500 units from 2’000 to 120’000 m3/h per unit Fire fighting systems 800 points Compressed air 14 stations distribution network 200 km Demineralised water production 20 m3/h - 0.1 μS/cm IT4005/EN - Bidders Conference

  16. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  17. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  18. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  19. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  20. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  21. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  22. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  23. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  24. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  25. TENDER DOCUMENTS: TECHNICAL SPECIFICATION A detailed quote has to be provided for each job request IT4005/EN - Bidders Conference

  26. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  27. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  28. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  29. TENDER DOCUMENTS: TECHNICAL SPECIFICATION This clause replaces paragraph 4.1.5 in the technical specification IT4005/EN - Bidders Conference

  30. TENDER DOCUMENTS: TECHNICAL SPECIFICATION 5 months implementation phase IT4005/EN - Bidders Conference

  31. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  32. TENDER DOCUMENTS: TECHNICAL SPECIFICATION • 8.2 Meetings • 8.2.1 Weekly meetings • 8.2.2 Monthly meetings • 8.2.3 Ad hoc meeting • 8.3 Reporting • 8.2.1 Daily reports (during shutdwon and technical stops) • 8.2.2 Weekly reports • 8.2.3 Monthly activity reports IT4005/EN - Bidders Conference

  33. TENDER DOCUMENTS: TECHNICAL SPECIFICATION IT4005/EN - Bidders Conference

  34. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  35. TENDER DOCUMENTS: ANNEX A Working on CERN Site Dedicated presentation IT4005/EN - Bidders Conference

  36. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  37. TENDER DOCUMENTS: ANNEX B: Technical Prescription for piping and Accessories IT4005/EN - Bidders Conference

  38. TENDER DOCUMENTS: ANNEX B: Technical Prescription for piping and Accessories IT4005/EN - Bidders Conference

  39. TENDER DOCUMENTS: ANNEX B: Technical Prescription for piping and Accessories For each defective weld, two additionnal welds to be controlled IT4005/EN - Bidders Conference

  40. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  41. TENDER DOCUMENTS: ANNEX C: Definition of Penalties IT4005/EN - Bidders Conference

  42. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  43. TENDER DOCUMENTS: ANNEX D: Technical Prescription for Tests-Inspection-Commissioning IT4005/EN - Bidders Conference

  44. TENDER DOCUMENTS: ANNEX D: Technical Prescription for Tests-Inspection-Commissioning IT4005/EN - Bidders Conference

  45. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference

  46. TENDER DOCUMENTS: ANNEX E: Example of work In the Evaluation Questionnaire, the contractor is asked to provide different information based on the drawing given in annexe E IT4005/EN - Bidders Conference

  47. PLAN • INTRODUCTION • CERN • CV Group • TENDER DOCUMENTS • Technical Specification • Annex A: Working on CERN Site • Annex B: Technical Prescription for Piping and Accessories • Annex C: Definition of Penalties • Annex D: Technical Presciption for Tests – Inspection - Commissioning • Annex E: Example of work • Description and Quantity Estimate IT4005/EN - Bidders Conference