Design Refinements|West Plaza. 60% Proposed Plan. GOALS:. Classic industrial architecture Define the space Identify pedestrian/ vehicle conflicts. Design Refinements|West Plaza. 90 % Proposed Plan. Design Refinements|West Plaza. Elevator & Stairway. Design Refinements|West Plaza.
E N D
Design Refinements|West Plaza 60% Proposed Plan GOALS: • Classic industrial architecture • Define the space • Identify pedestrian/ vehicle conflicts
Design Refinements|West Plaza 90% Proposed Plan
Design Refinements|West Plaza Elevator & Stairway
Design Refinements|West Plaza Elevator & Stairway
Design Refinements|West Plaza Elevator & Stairway
Design Refinements|West Plaza Elevator & Stairway
Design Refinements|West Plaza Elevator & Stairway
Design Refinements|West Plaza Railings Stairway Vehicle Pedestrian
Design Refinements|West Plaza Bike Rack
Design Refinements|East Plaza 60% Proposed Plan GOALS: • Simplified circulation • Programmable spaces • Engage the space • Allow art opportunities
Design Refinements|East Plaza Design Process GOALS: • Simplified circulation • Programmable spaces • Engage the space • Allow art opportunities
Design Refinements|East Plaza 90% Proposed Plan
Design Refinements|East Plaza Seat Walls
Design Refinements|East Plaza Railings Vehicle Stairway Pedestrian
Design Refinements|East Plaza Railings
Design Refinements|East Plaza Way finding & Signage
Design Refinements|East Plaza Way finding & Signage
Design Refinements|East Plaza Way finding & Signage
Design Refinements|East Plaza Planting
Design Refinements|East Plaza Planting
Design Refinements|East Plaza Planting
Timeline a. b. c. d. • Preliminary & Final Design March 2009 • 30% presentation to SDC - November 20, 2008 • 60% presentation to SDC - January 15, 2009 • 90% presentation to SDC - February 19, 2009 • Construction Civil Package June 2009 • (landscape & urban design) • Bridge Structures July 2009 • Construction Complete June 2010