Rooftop Sites – Sites 1, 2Dual-Tilt Ballasted Racking System Example
Parking Garage Sites – Sites 3, 4, 5Pre-Fabricated Truss Racking System Example
Parking Garage Sites – Sites 3, 4, 5Pre-Fabricated Truss Racking System Example
Surface Parking Site – Site 6Pre-Fabricated Canopy Racking System Example
Surface Parking Site – Site 6Pre-Fabricated Canopy Racking System Example
Power Purchase Agreement (PPA) Solicitation: • RFP issued by UCSB Procurement Office (March 2015) • job walk (March 2015) • technical and price proposals received (April 2015) and reviewed • project award (May 2015)and start contract negotiation • contract execution (November 2015)
PPA Award: • SunPower identified as apparent awardee based on best value (Cost per Quality Point) analysis • Determining variables: • module efficiency • aggregate system capacity • quality of proposed racking/structural components • monitoring and maintenance plan • company financial strength • experience with SCE Rule 21 Non-Export interconnections • experience on UC campuses
PPA Negotiation and Terms: • 20 year contract term • $.1175/kilowatt-hour • 0% contract escalator • five-year extension option: ₵7.0/kilowatt-hour • production guarantee: 97% of predicted • up-front PM, peer review, inspection costs built into rate
Sat. Sun.
Thurs. Fri. Sat. Sun. Mon. Tues. Weds.
Thurs. Fri. Sat. Sun. Mon. Tues. Weds.
Summary: • 12% campus annual electrical usage offset • avoided cost: $.147/kWh • year 1 cost savings: $270k • 20-yr net savings: $14.5 million