1 / 4

Update on SoLID

Update on SoLID. Jian -ping Chen, Jefferson Lab SoLID Collaboration Meeting November 8-9, 2013. SoLID Status Update. Main Progress: pCDR , completed All sub-systems have ‘final” conceptual design Cost estimation, iterated with Hall A/Physics Division

kadeem
Download Presentation

Update on SoLID

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting November 8-9, 2013

  2. SoLID Status Update • Main Progress: • pCDR, completed • All sub-systems have ‘final” conceptual design • Cost estimation, iterated with Hall A/Physics Division • Main contents, iterations in progress • Background: (Zhiwen Zhao, Rich Holmes, RakithaBeminiwattha) • Difficulties with realistic background situation, especially for PVDIS • Optimize design of the baffles to reduce background • Identify source/profile of background • Considerations/impacts on triggers, offline PID and tracking • EM calorimeter: (Xiaochao) • Simulation and study impact of background, pile-up • Variable level of cuts (radial and azimuthal angle) for trigger • Pre-shower design, MAPMTs • Scintillator Pad Detector (SPD) to reduce photo background. • Impact on trigger • Full simulation for SIDIS • Set up pre-R&D test stand (with DAQ system) • Light Cherenkov: (Michael Paolone) • Simulation with background • Combined with EC for trigger and for offline analysis.

  3. SoLID Status Update (II) • Heavy Gas Cherenkov: (Mehdi Meziane) • Angular coverage • Space availability • QAD/Trigger System: (AlexandreCamsonne) • Updated design with new inputs from EC/LC (Alexandre’s talk) • Simulation/calculations • Test stand • GEMs • GEMs- China progress (Jianbei Liu) • monthly meetings/fund application preparation • 2) GEMs- US (Kondo Gnanvo) • R&D/ construction for SBB / beam test at Fermi Lab • Readout system study (SR vs INFN systems) • Other progress/issues: • Magnet:, preparation for extracting/moving CLEO magnet to JLab • Tracking (Ole Hansen) • Support structure • New available equipment (DIRC) • New collaborators • New proposals

  4. Milestone, Schedule • pCDR“complete” • Director’s review: in two months? • Discussion with DOE: in a few months? • Submit MIE/MRI: 2014? • CD process: 2014-2015? • Simulation/improvement: continuing • Pre-R&D: starting now • CDR/TDR

More Related