1 / 13

Oil & Gas Conservation Getting a Well Drilled

Oil & Gas Conservation Getting a Well Drilled. Week Two September 2, 2010. Eric R. King. Intent to Drill OAC Form 1000. Geologic Mapping. Structure Net Isopach Map. Geological exhibit structure and isopach map. Isopach map. Bonded Operator. Requirements: Operator’s Agreement

kaden-beach
Download Presentation

Oil & Gas Conservation Getting a Well Drilled

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oil & Gas Conservation Getting a Well Drilled Week Two September 2, 2010 Eric R. King

  2. Intent to DrillOAC Form 1000

  3. Geologic Mapping • Structure • Net Isopach Map

  4. Geological exhibit structure and isopach map

  5. Isopach map

  6. Bonded Operator • Requirements: • Operator’s Agreement • OAC 165:10-1-10 • Category “A” Surety • Category “B” Surety • Financial Statement as Surety • OAC 165:10-1-11

  7. Corporate Surety Bond • OAC 165:10-1-12 • Irrevocable Commercial Letter of Credit • OAC 165-10-1-13 • Cashier’s Check, Certificate of Deposit etc. • OAC 165-10-1-14

  8. Completing a Well

  9. Completion ReportOAC Form 1002A

  10. Initial One Point TestOAC Form 1016

  11. Annual One Point TestOAC Form 1017

  12. Eric R. King One Leadership Square, 15th Floor 211 N. Robinson Ave. Oklahoma City, OK 73102 (405) 235-5518

More Related