1 / 22

2011 Sediment Investigations

2011 Sediment Investigations. Johann (Hans) Biberhofer NWRI, WSTD, AEMR. In situ flume. New capabilities. Velocimeter installed in the test chamber Capacity to capture a segment of mobilized particles Integrate additional sensors including OBS and LISST Further enhancements planned.

kail
Download Presentation

2011 Sediment Investigations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2011 Sediment Investigations Johann (Hans) Biberhofer NWRI, WSTD, AEMR

  2. In situ flume New capabilities Velocimeter installed in the test chamber Capacity to capture a segment of mobilized particles Integrate additional sensors including OBS and LISST Further enhancements planned

  3. In situ flume - surface sampling

  4. STING Survey STING Probe Fitted profile

  5. East of Topsail STING 65 Sites – 378 impacts

  6. Little Lake George Channel STING 44 Sites – 191 Impacts

  7. GeoTech Survey

  8. EoT – Bathymetry

  9. Spanish – 563 km, 147,981 sounding

  10. Spanish Bathymetry

  11. Spanish – Eastern Extent

  12. Thunder Bay – ADCP and Temperature Measurements

  13. Plume dispersion Near Field Far Field

  14. Randle Reef

  15. Randle Reef

More Related