50 likes | 222 Views
P. Muraca v0.4 Data Comm DCL Trials end to end system test. DCL Trials Architecture. Airline HOST. TOWER. ARTCC. DTAP. 1. HOST. MONITOR. HADDS CSP & API. FDP. ARINC. HID. KYBRD. HMI. DCL. HADDS. ERAM. FNTB. FANS 1/A+ STACK. AFN. MOUSE. DEMARC. TEST. IP. DATA RECORD.
E N D
P. Muraca v0.4 Data Comm DCL Trials end to end system test
DCL Trials Architecture Airline HOST TOWER ARTCC DTAP 1 HOST MONITOR HADDS CSP & API FDP ARINC HID KYBRD HMI DCL HADDS ERAM FNTB FANS 1/A+ STACK AFN MOUSE DEMARC TEST IP DATA RECORD FTI OPSIP NESG ED-8 ACY HADDS TEST ED-8 ACY OS DEMARC DEMARC ERAM TOWER HID 2 IP TEST DTAP TDLS 2 HOST DEMARC TOWER DTAP HADDS ERAM 3 2,3 2,3 DTAP TDLS 3 SITA HID 2,3 HOST 2,3 ARTCC 2,3 Airline HOST
System Test - DCL TRIALS ARCHITECTURE Tech Center Trials Lab Subnetworks FNTB DTAP 618-622-do258a HOST MONITOR HADDS CSP & API FDP ARINC HID KYBRD HMI DCL HADDS ERAM Airline HOST FANS 1/A+ STACK AFN MOUSE DEMARC IP 620-622-do258a NESG ED-8 ACY DATA RECORD IP 620-622-do258a Airlines Tech Center Project Aircraft – N47 DEMARC IP Strip Printer 620-622-do258a PC-RCU HADDS Airline HOST DEMARC Rs 429 Sim, playback TDLS legacy AVIONICS SITA gui Fans 1/A+ 618-622-do258a Tech Center Project Aircraft – N47
Lab and Field Test Phases Test Phase 1 Test Phase 2 Test Phase 3 Test Phase 4 Test Phase 5
Test Phase 1 – Lab Environment Tech Center Trials Lab Subnetworks FNTB DTAP HOST MONITOR HADDS CSP & API FDP ARINC HID KYBRD HMI DCL HADDS ERAM FANS 1/A+ STACK AFN MOUSE DEMARC IP 620-622-do258a NESG ED-8 ACY DATA RECORD IP 620-622-do258a Tech Center (N47) ACARS / Satcom ACY DEMARC IP Strip Printer 620-622-do258a PC-RCU HADDS DEMARC Rs 429 Sim, playback TDLS legacy AVIONICS Toolset GROUND Toolset SITA gui Fans 1/A+ Fans 1/A+ Tech Center Project Aircraft – N47