50 likes | 168 Views
CERN Model Program: Coil Status (Nov 28). Model 1 (April 2014). 2-in-1Model 1 (October 2014). Model 2 (July 2014). CERN Model Program: Coil Status (Dec 17). Model 1 (April 2014). 2-in-1Model 1 (October 2014). Model 2 (July 2014). CERN Tooling Status (Nov 28).
E N D
CERN Model Program: Coil Status (Nov 28) Model 1 (April 2014) 2-in-1Model 1 (October 2014) Model 2 (July 2014)
CERN Model Program: Coil Status (Dec 17) Model 1 (April 2014) 2-in-1Model 1 (October 2014) Model 2 (July 2014)
CERN Tooling Status (Dec 17) (*) Some parts out of tolerances, being re-manufactured