ATLAS & D0 D0: Status, software & analysis Frank Filthaut & Silke Duensing ATLAS: Software & analysis Stan Bentvelsen Silicon tracker Simon Peeters -spectrometer End-cap toroids MDT chambers Electronics Alignment Detector control Data-acquisition F. Linde, 14-December-2001, Amsterdam
End-cap Toroids: Coils HMA power systems Job: wind & impregnate 28 coils Status: prototype coil exists Outlook: end-cap # 1: 2004? end-cap # 2: 2005? } cost overrun claims
End-cap Toroids: Vessels Schelde Exotech Job: 2 vacuum vessels Status: end-cap # 1 delivered to CERN Outlook: end-cap # 2: summer 2002
MDT Chambers r.m.s. wire sag contribution X-ray tomography
Electronics: Alignment Job: 5,000 RASNIK alignment systems + DAQ + software Status: masks, lenses and CCDs distributed DAQ & software prototyped and in use “everywhere” Outlook: complete in 2004 (not critical) off-chamber on-chamber MasterMux USA15Mux lens multiplexer CCD mask
Electronics: Detector Control Job: 1,200 CAN based detector control systems + DAQ + software Status: T-sensors delivered; 3D B-sensors prototyped CAN nodes pre-series to be distributed DAQ & software prototyped Outlook: complete in 2003 (not critical) on-chamber CAN Network T-sensors 30/chamber T0.2 oC B-sensors B/B10-4 extra bus (insurance) digital busses to MDT front-end
Electronics: Data-Acquisition TDC 1 TDC 1 CSM CSM 18 x 18 x TDC 18 TDC 18 on MDT chambers off MDT chambers USA15 Surface MROD (NIKHEF) (256) ROB (256) CSM-Link 1.28 Gbit/s S-Link to ROB 6 x CSM-Link ROD or ROB “OUT” CSM ROD or ROB “IN”
Cosmic-Ray Test • Objectives: • system test! • Develop: • DCS, DAQ • C++ software