320 likes | 1.25k Views
BUILDING MARKING SYSTEM. STRUCTURE / HAZARDS EVALUATION MARKING. Building Marking Systems. Structure Hazards Evaluation Form. MAP. TEAM NAME:. TX-TF1 SEARCH #1. DATE/TIME OF QUAKE:. SUN 23FEB92 110 HRS. N. CHURCH. GOOD MARKET. FIRST STREET. P.S. #1 SCHOOL K-6. A STREET. B STREET.
E N D
BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING
Building Marking Systems Structure Hazards Evaluation Form
MAP TEAM NAME: TX-TF1 SEARCH #1 DATE/TIME OF QUAKE: SUN 23FEB92 110 HRS N CHURCH GOODMARKET FIRST STREET P.S. #1SCHOOL K-6 A STREET B STREET
Building Marking Systems STRUCTURE / HAZARDS MARK • Structure and Hazmat spec make a 2’ x 2’ box on building adjacent to accessible entry. • Done after doing hazards assessment and filling out structure / hazards evaluation. • Box is spray painted with using international orange (in TF cache)
Building Marking Systems STRUCTURE / HAZARDS MARK • Structure relatively safe for SAR ops. There is little chance of further collapse. • Victims could be trapped by contents • Victim could be unconscious
Building Marking Systems STRUCTURE / HAZARDS MARK • Structure is significantly damaged. Some areas may be relatively safe, but others may need shoring, bracing, removal, and/or monitoring of hazards • Building could be completely pancaked
Building Marking Systems STRUCTURE / HAZARDS MARK • Structure is NOT SAFE for rescue ops and may be subject to sudden collapse. Remote search ops may proceed at significant risk. If rescue ops are undertaken, safe haven areas, & rapid evacuation routes (with structural monitoring) should be created.
Building Marking Systems STRUCTURE / HAZARDS MARK • Arrow next to Marking Box indicates the direction of Safest Entry to Structure
Building Marking Systems STRUCTURE / HAZARDS MARK • HM indicates hazardous material condition in or adjacent to structure. SAR Ops normally will not be allowed until condition is better defined or eliminated. HM
15JUN92 HM NATURAL GAS OR-1 Building Marking Systems STRUCTURE / HAZARDS MARK - SUMMARY No entry until gas is turned off. When it’s mitigated, should line out the HM mark and record new date and TF
BUILDING MARKING SYSTEM SEARCH ASSESSMENT MARKING
Building Marking Systems SEARCH ASSESSMENT MARK 15JUL92 1400 HR 2’x2’ X near each entry OR-1 RATS First slash made when entering 3 DEAD Crossing slash made as TF exits
BUILDING MARKING SYSTEM VICTIM LOCATION MARKING
Building Marking Systems VICTIM LOCATION MARKING CA6 CA6 CA6 POTENTIAL VICTIM CA6 CONFIRMED LIVE VICTIM CONFIRMED DEAD VICTIM REMOVED VICTIM
HAZARD INFORMATION Go or No Go (G/N) Team Time/Date of Start Time/Date of End # LIVE VICTIMS REMOVED # DEAD REMOVED PERSONS UNACCOUNTED FOR LOCATION OF OTHER VICTIMS VICTIM LOCATION MARKING
Open Shaft: Quad E Go UKSAR 1 17/2/04 0830 17/2/04 1147 3 0 4 2 D
V Potential Victim Number and status unknown
V CONFIRMED VICTIM LOCATION Arrow denotes confirmation L or D denotes number of each L 2
V ONLY DEAD BELOW ! Arrow denotes confirmation D denotes number of each D2
V L 2 D 1 VICTIMS (all) Extricated Circle indicates that all located victims have been extricated (including dead).