100 likes | 254 Views
NABARD – WDF Seventhipatty & vadavathur watershed Namakkal - District Full implementation phase Watershed Code No:4B1B3b3a1 &4B1B3b3a2. PFA - HEALDS. WATER ABSORPTION TRENCH Total cum : 1440 Total amount :Rs 60746 Work completed : 1050 cum Balance work :390 cum.
E N D
NABARD – WDFSeventhipatty & vadavathur watershedNamakkal - District Full implementation phaseWatershed Code No:4B1B3b3a1 &4B1B3b3a2 PFA - HEALDS
WATER ABSORPTION TRENCHTotal cum : 1440 Total amount :Rs 60746Work completed : 1050 cum Balance work :390 cum WATER ABSORPTION TRENCH (BEFORE) WATER ABSORPTION TRENCH (AFTER)
WATER ABSORPTION TRENCH WATER ABSORPTION TRENCH (BEFORE) WATER ABSORPTION TRENCH (AFTER)
CONTOUR TRENCH Total cum :1203Total amount : 50749Contour trench work is completed CONTOUR TRENCH (BEFORE) CONTOUR TRENCH (AFTER)
CONTOUR TRENCH CONTOUR TRENCH (BEFORE) CONTOUR TRENCH (AFTER)
STONE GULLY PLUGSTotal Rm : 66Total amount : 21204Stone Gully plugs work is completed STONE GULLY PLUGS (BEFORE) STONE GULLY PLUGS (AFTER)
STONE GULLY PLUGS STONE GULLY PLUGS (BEFORE) STONE GULLY PLUGS (AFTER)
LOOSE BOULDER STRUCTURE LOOSE BOULDERS STRUCTURE (BEFORE) LOOSE BOULDERS STRUCTURE (AFTER)
LOOSE BOULDER STRUCTURETotal cum : 90Total amount : 29645Loose boulder structure is completed LOOSE BOULDER STRUCTURE (BEFORE) LOOSE BOULDER STRUCTURE (AFTER)