560 likes | 697 Views
MIPAS aircraft : current activities (update 07.10.2005) POF: Topic 4: Changes in the Tropopause Region Topic 5: The Stratosphere in a Changing Environment Current group members : Thomas Gulde, Corneli Keim, Guangyuan Liu, Christof Piesch, Cornelis Blom,
E N D
MIPAS aircraft : current activities (update 07.10.2005) • POF: Topic 4: Changes in the Tropopause Region • Topic 5: The Stratosphere in a Changing Environment • Current group members : Thomas Gulde, Corneli Keim, Guangyuan Liu, Christof Piesch, Cornelis Blom, • (Michael Höpfner, AME) • Former group members : Dagmar Buggle, Esat Cetin, Norbert Glatthor, Michael Höpfner,Wolfgang Kimmig, • Katrin Lessenich, Peter Loes, Guillaume Piard, Christian Sartorius, Ralf Schlipper MIPAS-STR : MIPAS on stratospheric aircraft (M55-Geophysica) http://www-imk.fzk.de/asf/mipas-str/ MIPAS-STR IMK-Seminar 7 Oktober 2005
main activities since 27 April 2005 • HALO: GLORIA-AB and POLSTRACC • Demonstrator (Praktikum Elio König, Sept. 2005 ) • Preparation for the SCOUT-O3 campaign (Nov/Dec 2005) • Telemetry: up- and downlink (cooperation with IPE) • TC5 : Testcampaign from O‘hofen (July 2005) • Data retrieval of the Aracatuba campaign MIPAS-STR IMK-Seminar 7 Oktober 2005
Elio beim Montieren des GLORIA Demonstrators Jetzige Version des Demonstrators Laborstruktur mit: Komplettes DPI (Rotor, Stator, Antrieb, Strahteilereinheit). LMI-Zweig wurde getestet mit Bruker IFME Nächste Ausbaustufe: Detektorarray (AIM) Quelle MIPAS-STR IMK-Seminar 7 Oktober 2005
main activities since 27 April 2005 • HALO: GLORIA-AB and POLSTRACC • Demonstrator (Sept. 2005, Elio König) • Preparation for the SCOUT-O3 campaign (Nov/Dec 2005) • Telemetry: up- and downlink (cooperation with IPE) • TC5 : Testcampaign from O‘hofen (July 2005) • Data retrieval of the Aracatuba campaign MIPAS-STR IMK-Seminar 7 Oktober 2005
4.11. 4.11. 7.11. 8.11. 11.11. 11.11. MIPAS-STR IMK-Seminar 7 Oktober 2005
Preliminary conclusions (27 April 2005) • Zenith measurements successful (improved deep-space calibration) • Telemetry: up- and downlink: successful, but improvement needed for SCOUT • Various other changes (heaters etc.) worked excellent (tropics !!) • Despite various ‘logistical’ problems (extremely short preparation phase in Aracatuba) and inherent problems with clouds we have obtained good measurements at the time of the Envisat overpass. 2nd shutter for zenith measurements MIPAS-STR IMK-Seminar 7 Oktober 2005
Telemetry System: Iridium Datenrate: 300 bytes/sec = 1 Datenpaket / 2s Successful tests in the two flights during TC5 (July 2005) MIPAS-STR IMK-Seminar 7 Oktober 2005
main activities since 27 April 2005 • HALO: GLORIA-AB and POLSTRACC • Demonstrator (Sept. 2005, Elio König) • Preparation for the SCOUT-O3 campaign (Nov/Dec 2005) • Telemetry: up- and downlink (cooperation with IPE) • TC5 : Testcampaign from O‘hofen (July 2005) • Data processing of the Araçatuba campaign MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
17.02.2005 : MIPAS-STR tangent points Falcon Geophysica 12:45 UTC 18.9 °S 13:20 UTC 22.6 °S MIPAS-STR IMK-Seminar 7 Oktober 2005
Continuum from micro window #11 (952.03 – 953.50 cm-1 ) MIPAS-STR IMK-Seminar 7 Oktober 2005
15.02.2005 : MIPAS-STR tangent points MIPAS-STR IMK-Seminar 7 Oktober 2005
17.02.2005 : MIPAS-STR tangent points Falcon Geophysica 12:45 UTC 18.9 °S 13:20 UTC 22.6 °S MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
Summary (7 October 2005) • HALO: GLORIA-AB and POLSTRACC • Demonstrator : our contribution in-line with schedule • Preparation for the SCOUT-O3 campaign (Nov/Dec 2005) • Telemetry: up- and downlink : completed and tested • TC5 (for CHRISTA-NF and MARSCHALLS) • 2 successful test flights for MIPAS-STR • Data retrieval of the Aracatuba campaign • 17.02.2005 flight : profiles for CH1, work on CH2 in progress • 15.02.2005 flight : level-1 processing in progress MIPAS-STR IMK-Seminar 7 Oktober 2005
ENVISAT Launch : 1 March 2002Chemistry Payload on ENVISAT: MIPAS, SCIAMACHY and GOMOSValidation of the ENVISAT measurements : ESABC (ENVISAT Stratospheric Aircraft and Balloon Campaign)Earlier validation activities : middle- and high latitudesFebruary 2005 : Validation in the tropicsAircraft: Bandeirante, Falcon and the Geophysica
Motivation for validation in the tropics • Interesting region for science, thus accurate satellite data needed • Measurements from Satellite difficult because Low temperatures at the tropopause Relatively high vertical resolution required
Why aircraft measurements for Envisat validation • Envisat is in a polar sun synchronous orbit • Equator crossing time : 10 and 22 hrs local time • Distance between two orbits about 3000 km • Aircraft can carry a large payload for - internal validation - measurement of complementary species
Campaign base - Aracatuba - and approximate range of aircraft sorties. • The bold black lines show the area of operation. MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR IMK-Seminar 7 Oktober 2005
Quick-look MIPAS-STR • Quick-looks for the 15.02.05 and 17.02.05 flights • The quick-look contains:Location of the tangent pointsCloud information from DC output of MIPAS-STR • Conclusions
B C
B A
A C
Conclusions • A – B : 28 limb scans (profiles); channel 1+2; 1st half with clouds below 13 km; 2nd half only clouds at the lower (8 and 9 km) tangent heights. • B – C: a few limb scans after the dive; channel 2 only; Thin clouds at the lower tangent heights (8 and 9 km); • C – A : 10 + 1 limb scans (in between non-linearity measurements) ; channel 2 only Thin clouds at the lower tangent heights (8 and 9 km) • Overpass 12:48 UTC at C “cloud free”
B C D A E
B C D
C D
D E
Conclusions • During the complete flight clouds were in the field of view of the MIPAS-STR instrument and of course also in that of MIPAS-Envisat, except in the last section • The last section was cloud free even at the 8 km tangent point and will be extremely useful for MIPAS-Envisat validation
Preliminary conclusions • Zenith measurements successful (improved deep-space calibration) • Telemetry: up- and downlink: succesful, but improvement needed for SCOUT • Various other changes (heaters etc.) worked excellent (tropics !!) • Despite various ‘logistical’ problems (extremely short preparation phase in Aracatuba) and inherent problems with clouds we have obtained good measurements at the time of the Envisat overpass. 2nd shutter for zenith measurements MIPAS-STR IMK-Seminar 7 Oktober 2005
MIPAS-STR Schedule in Aracatuba • 05.02.2005: Arrival of the MIPAS-STR team • 11.02.2005: Arrival of the MIPAS dome and interface • 12.02.2005: Installation of MIPAS-ST • 13.02.2005: EMC and engine tests • 15.02.2005: First Envisat validation flight (7:18 LT !!) MIPAS-STR IMK-Seminar 7 Oktober 2005
Overview of the flights wrt coincidences with MIPAS and SCIAMACHY OBSERVATIONS(includes all TROCCINOX flights were accidentally good coincidences were obtained)Aircraft: Geophysica (Falcon) (prepared by A. Lengel and C.E. Blom)
01.02.2005 SCIA: 13:12 UTC M55: 15:20 – 19:30 UTC
04.02.2005 SCIA: 13:18 UTC M55: 17:00 – 21:20 UTC
05.02.2005 SCIA: 12:46 UTC M55: 17:00 – 21:30 UTC
08.02.2005 SCIA: 12:53 UTC M55: 13:00 – 17:30 UTC