90 likes | 220 Views
LU and SEU testing at STAR and LBNL 88” cyclotron. LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans. IPHC – LBL phone meeting May 5, 2011. LU testing at STAR. Monitored power: 2 × VDA 2 × VDD 2 × VMEM 1 × VREG.
E N D
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL phone meeting May 5, 2011
LU testing at STAR Monitored power: • 2 × VDA • 2 × VDD • 2 × VMEM • 1 × VREG The electronics box contains: • 8 LU protected regulation PS PCBs (each is polyfused) • an NI DAQ6008 USB module • a PCB with electronic switches • a USB/fiber converter
LU testing at STAR • Setup @ STAR
1st (and so far the only) latch up (?) at VMEM • Begin monitoring: 13 April 2011, ~12:00 pm (EDT) • First registered event: 17 April 2011, ~9:00 pm (EDT) • Beam status at the time of the event • No new events until now (May 5, 2011) (500 GeV p+p)
LU and SEU at 88” • Test chamber • Readout system • Test PCB
LU and SEU at 88” cyclotron • Status: • No progress in measurements since our last report (Nov. 29) • SEU monitoring firmware in a validation phase • No beam time scheduled; we expect to be on-call for beam availability • Integration of Ultimate into the upcoming set of tests http://rnc.lbl.gov/hft/hardware/docs/latchup/latchup_for_IPHC_LBL_phone_meeting.ppt
Test integration with IPHC • During my visit at IPHC in February/March, Guy and I agreed on the interface between his memory test PCB and our setup: • Mounting holes (compatible with the existing fixture) • cable connectors (compatible with our setup) • The test PCB will easily interface to our Xilinx FPGA board for SEU and LU monitoring
Test plans • LU tests for Mimosa26 with 20 µm epi • SEU tests for both Mimosa 26 chips (15 and 20 µm epi) • SEU for all ladder/MTB components • SEU and LU for Ultimate • Memory test structures from IPHC (if available) • Time frame – undetermined at this time • Beam time at the cyclotron appears fully booked until January 2012 (some openings might become available)