1 / 18

NEPA, CEQA and the Renewable Energy Boom

NEPA, CEQA and the Renewable Energy Boom . Implications for Joint Compliance. Defenders of Wildlife. Overview. title here. Comparison of relevant NEPA and CEQA requirements. Discussion of issues with joint compliance

kaleb
Download Presentation

NEPA, CEQA and the Renewable Energy Boom

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEPA, CEQA and the Renewable Energy Boom Implications for Joint Compliance Defenders of Wildlife

  2. Overview title here • Comparison of relevant NEPA and CEQA requirements. • Discussion of issues with joint compliance • Two case studies: Ivanpah Solar Thermal Generating System and Calico Energy Solar Farm. text here Defenders of Wildlife

  3. title here Differences Between NEPA and CEQA text here Defenders of Wildlife

  4. title here Differences Between NEPA and CEQA (Cont’d) text here Defenders of Wildlife

  5. NEPA and CEQA Joint Compliance title here • The environmental document will satisfy the requirements of both NEPA and CEQA. • State and federal agencies jointly draft and release a DEIR/DEIS, follow the requisite procedural requirements, and ultimately release an FEIR/FEIS. text here Defenders of Wildlife

  6. Problems with Joint Compliance title here • NEPA and CEQA have differing procedural timelines – public comment, interagency consultation, etc… • NEPA and CEQA have differing substantive requirements – alternatives, mitigation, etc… • NEPA and CEQA differ in definition of scope of environmental impacts. • Removal, translocation or relocation of listed species requires approval of wildlife agency (usually only USFWS). text here Defenders of Wildlife

  7. title here Renewable Energy Projects in California • Executive Order S-14-08 - Retail sellers of electricity shall serve 33 percent of their load with renewable energy by 2020. • Over 50 ARRA-eligible “fast-track” projects are proposed in California, ranging from a few hundred acres to 10,000 acres. • Around 200 total renewable projects are proposed in California. text here Defenders of Wildlife

  8. title here State Jurisdiction • California Energy Commission (“CEC”) has siting authority for solar thermal and geothermal power plants over 50 MW. • CEC site certification process is a certified regulatory program. The Staff Assessment is a functional equivalent of an Environmental Impact Report. text here Defenders of Wildlife

  9. title here Federal Jurisdiction • BLM must issue a right-of-way and a site specific amendment to the California Desert Conservation Plan. • These actions trigger NEPA and ESA requirements. text here Defenders of Wildlife

  10. NEPA, CEQA and Wildlife title here • Projects on BLM land trigger section 7 of the Endangered Species Act. • BLM as lead agency under NEPA must analyze significant impacts to wildlife. • CEC has interpreted its organic law, the Warren-Alquist Act, as allowing the agency to supercede the California Department of Fish and Game’s incidental take authority. • Therefore, the CEC issues its site certification “in lieu” of a state incidental take permit. CEC as lead agency under CEQA must also mitigate impacts to non-listed, special status species. text here Defenders of Wildlife

  11. Examples of Affected Species title here text here Migratory birds – Golden eagle, burrowing owl. Reptiles – desert tortoise, flat-tailed horned lizard. Rare plants – White-margined beard tongue, Mojave milkweed, Rusby’s desert mallow. Mammals – American badger, Nelson’s bighorn sheep, desert kit fox, giant kangaroo rat. Defenders of Wildlife

  12. title here Desert Tortoise • State and Federally listed threatened. • Declining throughout its range due to the cumulative load of human caused and disease-related mortality accompanied by habitat destruction, degradation, and fragmentation. • Predation also a major issue. • Many CA population are genetically distinct. • Ivanpah population found at high altitude. text here Defenders of Wildlife

  13. title here Ivanpah and Calico solar thermal projects text here Defenders of Wildlife

  14. title here First in Line: Ivanpah Solar Thermal Proposal Demonstrates New Challenges • 800 MW gas-fired power plant can be sited on 50-100 acres. • 400 MW Ivanpah plant is proposed to be sited on approximately 4,000 acres. • Alternatives analysis limited to “project” and “no-project”. BLM later issued a supplemental EIS to fully analyze two separate site reconfiguration alternatives. • Nested, in-lieu fee mitigation program is untested. text here Defenders of Wildlife

  15. CEC and BLM staff had begun drafting a SA/DEIS. After time constraints made the joint document impossible, they separated. Possible issues: scope of alternatives, public comment period, mitigation, interagency consultation. title here Calico Solar Thermal Proposal: an “Amicable Divorce” text here Defenders of Wildlife

  16. title here When do we get our new habitat? (or, the problem with in-lieu mitigation) • In-lieu mitigation – applicant pays into a fund, which is later used for habitat acquisition, habitat enhancement or management actions. • When are the lands acquired? Where are they located? What are the habitat enhancement actions? • Desert Renewable Energy Conservation Plan and interim measures. • Identify geographic areas designated for renewable energy project development. • Identify areas for conservation and declining species management. • Interim “interim” measures? text here Defenders of Wildlife

  17. title here Desert Tortoise Translocation • All desert tortoises must be translocated from the site in Spring or Fall. • Desert tortoise translocations are risky: disease, predation, and lack of forage. • Ft. Irwin translocation – 252 of 600 tortoises translocated in 2008 died. Additional translocation of 1,000 tortoises on hold. text here Defenders of Wildlife

  18. What about Programmatic Review? title here text here BLM and DOE are developing a Solar Energy Development PEIS. Assess environmental impacts associated with the development and implementation of agency-specific programs that would facilitate environmentally responsible utility-scale solar energy development in AZ, CA, CO, NM, NV and UT. PEIS will identify impacts, mitigation and two alternatives. Agency-specific actions can tier from it. Also see the Desert Renewable Energy Conservation Plan. Defenders of Wildlife

More Related