Proposed SCR 758 Enhancements to the Proposed Transmission Outage Report ROS Jan 2010 mtg. Aka “SCR 753 - part 2” SCR 753 added three fields of info to the public list of approved transmission outages.
E N D
Proposed SCR 758Enhancements to the Proposed Transmission Outage ReportROS Jan 2010 mtg • Aka “SCR 753 - part 2” • SCR 753 added three fields of info to the public list of approved transmission outages. • Proposed SCR 758 will add these same three fields of info to the public list of transmission outages awaiting approval.
Access both “approved” & “proposed” transmission outage postings here.
This is the “approved/planned” transmission outage file. Notice the first three columns (OutageID, DatePosted, & LastUpdated). These were added via SCR 753.
This is the “proposed” transmission outage file. SCR 758 asks that those same three columns be added to this posting.