I-294/I-80 RECONSTRUCTION re-construction of a 2-mile section of the toll way that started from MARKHAM yard bridge and extended easterly to Danville road. ABOVE PHOTOS: MAINLINE BRIDGE OVER THE THORNTON QUARRY OPERATED BY MATERIAL SERVICE CORP LOCATED IN THORNTON, ILLINOIS.
E N D
I-294/I-80 RECONSTRUCTIONre-construction of a 2-mile section of the toll way that started from MARKHAM yard bridge and extended easterly to Danville road. ABOVE PHOTOS: MAINLINE BRIDGE OVER THE THORNTON QUARRY OPERATED BY MATERIAL SERVICE CORP LOCATED IN THORNTON, ILLINOIS.
THE I-355 SOUTH EXTENSION CONSTRUCTION FROM I-55 to I-80 LOCATED IN WILL AND COOK COUNTY, ILLINOIS. • THE PHOTO AT THE RIGHT IS THE 1.2-MILE LONG BRIDGE OVER THE DES PLAINES RIVER (I & M CANAL) WHICH IS A PORTION OF THE 12.5 MILES TOLLWAY PROJECT. INTERSTATE 355 SOUTH EXTENSION
Illinois route 34 reconstruction and widening of a 2-mile section of the roadway started from lew street and exdending to eldamaine street in plano, Illinois.
I-57/IL-50 interchange reconstruction – in Bradley, illinoisLeft photo: bridge over ilLINOIS ROUTE 50. right photo: bridge over Illinois central rail road
fpdcc improvementsLeft photo: CONSTRUCTION OF PHYSICAL EXERCISE STAIR AT THE SWALLOW CLIFF RIGHT PHOTO: CONSTRUCTION OF FISHING PLATFORM AND INSTALLATION OF RIPRAP ALONG THE BANK OF MAPLE LAKE. BOTH PHOTOS ARE LOCATED IN PALOS HILLS, ILLINOIS