Team 8: Grand river rapids. Team 8. Aaron Vanderhill. Jim Barron. Jeff Van Laar. Tom Marshall. Outline. Project Design Alternatives Preliminary Design Feasibility Design Norms Issues Questions. Project. Primary Goal Return the rapids to the Grand River GGR Secondary Goal
E N D
Team 8 Aaron Vanderhill Jim Barron Jeff Van Laar Tom Marshall
Outline • Project • Design Alternatives • Preliminary Design • Feasibility • Design Norms • Issues • Questions
Project • Primary Goal • Return the rapids to the Grand River • GGR • Secondary Goal • Create a whitewater course • GRWW Revitalize Downtown Area
Design Alternatives • Removal of 5 beautification dams • Replace with natural rocks • Diversion Canal • Go around 4th street dam • 4th Street Dam modification • Removal of east side • Removal of 4th Street Dam
Preliminary Design • Combination of alternatives 1 and 3 • Replacement of downstream dams • Modification of 4th Street Dam • Reasons • Meets client’s needs • Improves fish habitat • Other alternatives not feasible • Sediment behind 4th Street Dam • Would look unnatural • Greater costs
Example of Stair-step Rapids www. grandrapidswhitewater.com
Feasibility • Many examples of other courses • Sufficient flow in river • Revitalization of downtown • Safer than existing conditions
Design Norms • Cultural Appropriateness • Suitable to all parties • Justice • Respect rights of fishermen and property owners • Stewardship • Naturalize river • Improve fish habitat
Issues • Modeling • Cost estimates • Acquiring data
Resources • HEC-RAS model of Grand River • Model from GRWW • FTC&H • GRWW