Team 8: Grand river rapids

Team 8: Grand river rapids. Team 8. Aaron Vanderhill. Jim Barron. Jeff Van Laar. Tom Marshall. Outline. Project Design Alternatives Preliminary Design Feasibility Design Norms Issues Questions. Project. Primary Goal Return the rapids to the Grand River GGR Secondary Goal

kalkin
Download Presentation

Team 8: Grand river rapids

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 8: Grand river rapids

  2. Team 8 Aaron Vanderhill Jim Barron Jeff Van Laar Tom Marshall

  3. Outline • Project • Design Alternatives • Preliminary Design • Feasibility • Design Norms • Issues • Questions

  4. Project • Primary Goal • Return the rapids to the Grand River • GGR • Secondary Goal • Create a whitewater course • GRWW Revitalize Downtown Area

  5. Design Alternatives • Removal of 5 beautification dams • Replace with natural rocks • Diversion Canal • Go around 4th street dam • 4th Street Dam modification • Removal of east side • Removal of 4th Street Dam

  6. Preliminary Design • Combination of alternatives 1 and 3 • Replacement of downstream dams • Modification of 4th Street Dam • Reasons • Meets client’s needs • Improves fish habitat • Other alternatives not feasible • Sediment behind 4th Street Dam • Would look unnatural • Greater costs

  7. Example of Stair-step Rapids www. grandrapidswhitewater.com

  8. Feasibility • Many examples of other courses • Sufficient flow in river • Revitalization of downtown • Safer than existing conditions

  9. Video

  10. Design Norms • Cultural Appropriateness • Suitable to all parties • Justice • Respect rights of fishermen and property owners • Stewardship • Naturalize river • Improve fish habitat

  11. Issues • Modeling • Cost estimates • Acquiring data

  12. Resources • HEC-RAS model of Grand River • Model from GRWW • FTC&H • GRWW

  13. Questions?