120 likes | 264 Views
NCEP SREF for the 2010 Christmas East Coast snowstorm. Jun Du Mesoscale Modeling Branch/EMC/NCEP. (I) Initially under forecast for the east coast snowstorm in general (a mixture of model physics, IC quality and predictability issue).
E N D
NCEP SREF for the 2010 Christmas East Coast snowstorm Jun Du Mesoscale Modeling Branch/EMC/NCEP
(I) Initially under forecast for the east coast snowstorm in general(a mixture of model physics, IC quality and predictability issue)
Problem: cyclone track forecasts were too to east of the observed track prior to Dec 25: e.g., 03z, Dec. 24, 2010 SREF mean forecast (84hr, Dan Petersen)
Sensitivity of cyclonegenesis to initial condition e.g., 03z, Dec. 24, 2010 SREF individual members (one Eta_KF and one RSM members are very close to the observed)
Sensitivity of cyclongenesis to initial condition, e.g., 03z, Dec. 24, 2010 SREF “bad” and “good” members (84hr) Bad Eta_KF member Good Eta_KF member Bad RSM member Good RSM member
Consequently, the problem for precipitation is that the major precipitation is too far from the coast prior to Dec. 25, 2010: e.g. 03z and 09z, Dec 24, 2010 SREF >1” probability (Rich Grumm) 03z, 84hr 09z, 78hr
Sensitivity of precipitation to initial condition: 03z, Dec. 24, 2010 SREF “bad” and “good” members Bad Eta_KF member Good Eta_KF member Bad RSM member Good RSM member
(II) Over-forecast for Washington DC area(mainly predictability issue)
SREF mean pcp (Geoff Manikin) 09z 12/25 03z 12/25 All means have > 0.50” in DC; LWX issued WS warning, partially based on this 15z 12/25 21z 12/25
25/03z 25/09z 25/15z SREF Prob 24hr Tot Pcp > 0.50”, valid 15z 12/27 (mean dashed) (Geoff Manikin) 25/21z 26/03z 26/09z Sharp gradient between 30 and 70% probability between Dulles and Chesapeake Bay
Sensitivity of precipitation to IC: e.g. 09z, Dec 25, 2010 SREF – a range of solutions from “good” to “bad” members 0.1-0.25” 0.01-0.1” 1.0-1.5” 0.5-0.75”
Summary • Predictability is definitely an issue for this storm, which is the reason why the EPS is so important in operation • Although physics deficiency and IC quality must play a role in the systematically biased forecasts prior to Dec. 25, 2010, the truth seems still lies within the SREF envelope (with low probability though) • After many years of “ensemble” era, people are, unfortunately, still looking for “yes or no” deterministic answers. It’s time to issue probabilistic forecasts such as this case for Washington DC: e.g., we should issue a forecast like this “20% chance of light snow (<1”), 50% chance of median snow (1-5”) and 30% chance of heavy snow (>10”)”. We need to change current forecast format