1 / 12

EPC/MPC Section Meeting

EPC/MPC Section Meeting. 12/02/2010. Section Highlights , News, Activities , HiRadMat Introduction, John’s presentation. Tour de Table,. Section Highlights - 2010. Welcome to John!! Operation:

kamuzu
Download Presentation

EPC/MPC Section Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EPC/MPC Section Meeting 12/02/2010

  2. Section Highlights, • News, • Activities, • HiRadMat Introduction, • John’s presentation. • Tour de Table,

  3. Section Highlights - 2010 • Welcome to John!! • Operation: Responsibility (maintenance, repair, improvement) on equipments used for the operation of LINAC, LEIR, Booster, PS, TT2, TT10, SPS, LHC Transfer lines, CNGS, LHC warm magnets and experimental zones (AD, East zone, North Zone Transfer line, nTOF, CTF3, ISOLDE, LHC Test benches, CMS, ALICE, LHCb)   1500 equipments 300W-20MW.

  4. Section Highlights - 2010 • Projects: - SPS Mains power converter: * Transformers: prototypes, tests and validation (+test bench), * Thyristors: Technical specification, contract. - New Electronic: * project start-up: functional spec (collect information from Sections) + design process. - HiRadMat: * Refurbishment/production of 14 converters (30kW/2MW – Switch Mode/Thyristor), - AD: * Consolidation program (T1B replacement, Danfysik consolidation, spare situation), * AEGIS (Delta converters), - LHC Test benches: * Electronic upgrade

  5. Section Highlights - 2010 • Projects: - Linac 4 (Transfer Line to Booster): *production and test of 6 x 400kW converters , - Bypass 2103 (BA2): * production and test of 5 switch mode converters: purchase components in 2010 for 2011 production. - TE/ABT Test bench: MSE building 867 (24kA) * Consolidation program (control Electronic), - Booster: * Installation/commissioning of 3 converters during 2010-2011 shutdown (?). - SPS MSE/MST BA6 (extraction SPS  TI2). * Installation and commissioning of a hot spare converter during 2010-11 shutdown (?).

  6. News from the injectors • CTF3: 15 february • AD: 22 March -12 April (HW tests) – Physics 10 May, AEGIS: no beam required in 2010 (installation during 2010 run, first beam in 2011) http://indico.cern.ch/getFile.py/access?contribId=21&sessionId=11&resId=0&materialId=slides&confId=70866 ELENA is coming back…. • East Zone: 26 April – Physics 29 Avril, Waiting for “consolidation” approval (480kCHF total, EPC=230kCHF): 2012 start-up? http://indico.cern.ch/getFile.py/access?contribId=20&sessionId=11&resId=0&materialId=slides&confId=70866 • Isolde: 26 Avril, • CNGS: 28 April, • North Zone: 6 May, http://indico.cern.ch/getFile.py/access?contribId=22&sessionId=11&resId=0&materialId=slides&confId=70866 • Ions for LHC (tentative!!): - Linac3 Mid-June, - LEIR 9 August, - Ions PS 23 August, - Ions SPS 6 September, - Ions LHC 18 October until 28 November, • Non LHC physics: end 22 November. • Please do not forget to take John with you for any intervention/Machine Start-up in 2010 (at least…)

  7. HiRadMat Présentation IEFC Workshop 11 February 2010 http://indico.cern.ch/getFile.py/access?contribId=25&sessionId=11&resId=0&materialId=slides&confId=70866