An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reminder: Structure and Assignments • Introduction (Prebys) • Elements • Work Breakdown Structure (Sims) • Subproject • 1.1 Linac (Allen) • 1.2 Booster (Prebys) • 1.3 Main Injector (Kourbanis) • 1.5 Proton Study Group (Prebys) • Cost and Schedule (Sims) • Proton Projections (Prebys)

  2. My Sections (delegating where noted) • Introduction • Status: Pretty good. Needs some language cleaned up • Booster Element: • 1.2.1 Rep. Rate and Reliability • Status: Still waiting on final numbers about 15 Hz operation from John Reid and Bob Ducar • 1.2.2 ORUMP • Status: Project complete. Writeup pretty good. Needs data on performance • 1.2.3 Corrector System • Responsible: Craig Drennan • Status: Not bad, but needs updating • 1.2.4 30 Hz • Needs descoping language • 1.2.5 Gamma-t • Status: Needs to be updated with simulation and experimental data • 1.2.7 Cavity cooling • Needs closeout language, as well as possible performance data (high rate tests?)

  3. My Sections (cont’d) • Booster (Cont’d) • 1.2.9 RF Cavities • IF it’s in the plan, John Reid will be primarily responsible • Writeup needs lots of work • 1.2.11 Booster Dump Relocation • Responsible: Bill Pellico • Writeup fairly complete • Needs closeout description and some performance data • 1.2.12 Booster Chopper • Still quite vague what this will entail • Might morph into something different. • 1.2.13 RF Improvements • Very vague what this includes. • Is it even still there?

  4. Proposed Agenda for Director’s Review