Homework 5

Homework 5. Design an equalization basin (for flow) if the flow rates to a Municipal wastewater treatment plant are given in the following table:

kare
Download Presentation

Homework 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Homework 5 • Design an equalization basin (for flow) if the flow rates to a Municipal wastewater treatment plant are given in the following table: • Design a primary settling tank for an industrial wastewater with a BOD5 of 600 mg/L and an SS of 400 mg/L to achieve a 60% SS reduction. The flow rate is 35 000 m3/day (assume he missing data).

  2. Homework 5 • For a complete mix activated sludge system, determine the aeration tank volume, the hydraulic retention time, the sludge wasted daily, the mass of sludge wasted daily, the fraction of sludge recycled, and the F/M ratio for the following conditions: • population equivalent 15000 (200 l/c/d) • influent BOD5=300mg/L, • effluent BOD5 = 20mg/L, • yield coefficient=0.55 and • decay rate=0.05/day. • Assume also that the MLSS in the aeration basin is 4 kg/m3, in the clarifier sludge is 18 kg/m3 and the mean cell residence time is 12 days.

More Related