40 likes | 248 Views
80. 80. Type 1 (16 Wells). Phase 1 (16 Wells). Type 2 (17 Wells). Phase 2 (17 Wells). 70. 70. Phase 3 (55 Wells). Type 3 (55 Wells). Phase 4 (120 Wells). 60. 60. Type 4 (120 Wells). Phase 5 (28 Wells). Type 5 (28 Wells). 50. 50. Rate / Net Pay (MCFD / FT).
E N D
80 80 Type 1 (16 Wells) Phase 1 (16 Wells) Type 2 (17 Wells) Phase 2 (17 Wells) 70 70 Phase 3 (55 Wells) Type 3 (55 Wells) Phase 4 (120 Wells) 60 60 Type 4 (120 Wells) Phase 5 (28 Wells) Type 5 (28 Wells) 50 50 Rate / Net Pay (MCFD / FT) Rate / Net Pay (MCFD / FT) 40 40 30 30 20 20 10 10 0 0 0 0 10 10 20 20 30 30 40 40 50 50 60 60 70 70 80 80 Time (Days) Time (Days) Proppant Transport Directly Impacts Well Productivity (Ref: Sharma et. al. 2005)
Effect of Retardation on Proppant Placement (viscous fluid) Without Retardation With Retardation
Drying of Water in Cores(Berea sandstone, permeability=85 mD, DP=0.87 atm) Gas flow