1 / 7

National Proficiency Testing Scheme

Progress Meeting. Executive Committee Meeting last met on 1 June 2005I (misguidedly) accepted the chairmanship from LSIt was felt that the National Proficiency Testing Scheme should be run by a unified laboratory body for the laboratories?National Proficiency Assessment Services for Roads (NPASR)SANAS requires that the industry set up an accredited proficiency testing scheme, with follow-up and feedbackOnly accredited laboratories will be used.

karl
Download Presentation

National Proficiency Testing Scheme

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. National Proficiency Testing Scheme Mervyn Henderson

    2. Progress Meeting Executive Committee Meeting last met on 1 June 2005 I (misguidedly) accepted the chairmanship from LS It was felt that the National Proficiency Testing Scheme should be run by a unified laboratory body for the laboratories—National Proficiency Assessment Services for Roads (NPASR) SANAS requires that the industry set up an accredited proficiency testing scheme, with follow-up and feedback Only accredited laboratories will be used

    3. Pilot Study Follow-up WC: Barry Dumas gave feedback to labs wrt outliers Not been done in Gauteng Both in WC and Gauteng busy with PT studies ALD Marshall stability and flow Mod. AASHTO density test must still be finalised (Jan.) Results ready for workshop in February 2006 The confidence limits for tests included in the proficiency testing scheme will be part of the output

    4. Discussions on theTOR ExCo will drive and oversee the process and act as a Board of the national body (NPASR) The service provider will be paid from an annual levy obtained from all participating laboratories and retained for a 3-year period to coordinate the national scheme A formal, National Coordinating Body should be created to manage the proficiency scheme

    5. Discussions on theTOR Terms of Reference is required for a Tender to secure a service provider Dumas and Vlok document to form the basis

    6. Establishment of a Business Entity to Run the Scheme SANRAL will put the contract out to tender and will fund the establishment of the scheme The meeting will constitute the ExCo and coordinating body and be responsible for managing the service provider and coordinating the scheme

    7. Establishment of a Business Entity to Run the Scheme SANRAL requested that Sabita and C&CI support the scheme by identifying technical experts to review revised test methods that will be investigated as part of the scheme

    8. Action Plan Representation from ASPASA and SAACEL suggested The TOR to be circulated to Exco and comments by end June One reply so far! Once agreed on, the ToR will be the basis for a SANRAL tender for a service provider

More Related