An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AccuGrade Compaction GPS Mapping & Measurement System

  2. AccuGrade Connected Worksite ARO AccuGrade Ready Option

  3. AccuGrade Compaction

  4. AccuGrade Compaction • System Components • Vibratory Control System • Mapping System • Accelerometer MEASURES STIFFNESS (not density) • Microcontrollers • Vibration control switches at operator station • CCV (Caterpillar Compaction Value) • Mast mounted GPS receiver • Data Radio • Drum slope sensor • In-cab display

  5. Radio GPS Receiver Display Controllers Slope Sensor Accelerometer AccuGrade Compaction

  6. AccuGrade Compaction - WHY? • FACT: The road construction industry is changing. • Pavement Design Method • Contract Procurement Methods • Quality Control Parameters

  7. Empirical Design • Pavement Design • Outdated methodology • 1958 AASHTO Test Road • Results: Design of Pavement Structures • Output is THICKNESS • Contract Procurement • Quality Control

  8. Mechanistic-Empirical Design • 1987 FHWA Long-Term Pavement Program (LTPP) • 20 Year Study of Pavement Sections • 2500 Locations US/Canada • M-E Design • Historical Data of Pavements • Inputs Increased • Prediction Models Developed • Output is PERFORMANCE

  9. AccuGrade Compactor Stiffness Values Mechanistic-Empirical Design Model AccuGrade Compaction • Environment • Traffic • Materials • Volumetric Properties PERFORMANCE

  10. AccuGrade Compaction - WHY? • Pavement Design • Contract Procurement • Material Costs • Infrastructure Age • Priorities • Road Budgets • Traffic / Loads • Quality Control Creative Contract Procurement

  11. Owner RISK Contractor Method DBFO Contract Procurement • Method • End Result • Performance Based • Warranty • PPP • (Public Private Partnership) • DBFO • (Design, Build, Finance, Operate)

  12. Money for DOT’s • More projects sooner • Higher Quality • Shifted Risk What’s Their Solution • Indiana East-West Tollway • $3.8B - 75 yrs. • Trans-Texas Corridor • $1.35B - 50 yrs. • Chicago Skyway • $1.83B - 99 yrs. • Detroit-Windsor Tunnel • Sydney Toll Roads QUALITY = Profit

  13. Private Investment: Higher Quality Timely Completion Europe Method DBFO

  14. AccuGrade Compaction - WHY? • Pavement Design • Contract Procurement • Quality Control • Real-Time Corrections • Timely Reporting • Focused Testing • Time Management • Position & Time Stamp • Safety

  15. Quality Control • AccuGrade Compaction • Instrument -Based System • Requires Calibration • Side-by-Side Testing • Develop Compaction Curves • Develop a Database / Targets • Develop a Comfort Level

  16. Implementation • FHWA Pooled Fund Study • Thirteen states • Varying materials • Three years • Four projects in ‘08 Accelerated Implementation of Intelligent Compaction Technology for Embankment Subgrade Soils, Aggregate Base, and Asphalt Pavement Materials

  17. Typical Procedure • Map existing base • Identify pre-existing anomalies • Compact in “Production Mode” • High Amplitude • Production Speed & Direction • Map the layer “Proofing Mode” • Low Amplitude • Forward Direction • Compare to established methods • Develop a Target Value for the AccuGrade Measurement System

  18. AccuGrade Compaction • AccuGrade Compaction is a TOOL. • Can use for Method Spec. • (Pass Counting) • Also evaluate stiffness values • Find undesirable areas • Test and evaluate those areas • More in-situ testing = Less in- situ testing • Grade Checker • As-Built Data • Production Calculations • Grade “Busts”

  19. Compaction Target Value (CTV) = 42 Current MnDOT QC/QA % Target CCV IC Data >130% 55 26% 90-130% 38 - 55 68% 80-90% 34 - 38 4% 70-80% 29 - 34 1% <70% < 29 < 1% Acceptance Criteria: Over 90% of IC Data should be greater than 90% of Compactor Target Note the high CCV’s at the Edges!!!

  20. AccuGrade Technology • Production - Completion Time • Quality - Rework • Pavement Life - Maintenance WHO WINS? - EVERYONE

  21. In Development • Machine Drive Power • Measure energy to propel machine • Ideal for padfoot rollers (cohesive soils) • AccuGrade for Asphalt • Temperature Mapping • Pass Counting • Common display

  22. AccuGrade Office • Converts engineering design files to AccuGrade® compatible format • Supports wireless communication between the machine and office • Compatible with all AccuGrade® machines • Supports text messaging in real time with operator • Productivity Module for cycle times, as-built data, and production related information • Compaction Module for detailed compaction analysis

  23. AccuGrade Office Compaction Module: Quality Control parameters logged.

  24. Builders -vs- Manufacturers • Caterpillar was a BUILDER • Today - MANUFACTURER • Success related to Quality Initiatives • Road Builders will become Road Manufacturers