Data Rich, Analysis Poor – Letting Everyone Get Involved. Ad Hoc and Tailored EVMS Reporting Presented By: Tony spillman. Why Ad Hoc EVMS Reporting?. Data Rich, Analysis Poor 20 years of experience or 1 year of experience 20 times?

karma
Download Presentation

Data Rich, Analysis Poor – Letting Everyone Get Involved

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Rich, Analysis Poor – Letting Everyone Get Involved Ad Hoc and Tailored EVMS Reporting Presented By: Tony spillman

  2. Why Ad Hoc EVMS Reporting? Data Rich, Analysis Poor 20 years of experience or 1 year of experience 20 times? EVMS Data is just Data – Value of Earned Value is in the Analysis

  3. Steps to EVMS Analysis • Validate data is accurate • Calculate Variances (SV, CV and VAC) • Focus on significant variances • Look at both current2 and cumulative1 • Graph and analyze trends • Look at comparative data • Analyze schedule trends, critical path • Provide written analysis (Cause, Impact and Corrective Action) • Evaluate remaining work versus project risks • Formulate plan of action • Assess realism of and adjust EAC accordingly

  4. Specific Needs for EVMS Reporting • Needs that Current Systems may not Integrate • Forecasting BCWP and SV Recovery • Detailed EAC/VAC Analysis • Risk Modeling and Change Control Impact Analysis • Estimated ACWP for non-labor • Flagging EVMS no-no’s • BCWP without ACWP (Free?) • ACWP without BCWP (not authorized?) • ETCs on Completed scope (EAC equal ACWP?) • Negative or $0 BCWS or EAC (Change control has lost control?) • Non-Standard or Infrequent Analysis • Fee Bearing Scope Performance • Staffing Plans and Resource Alignment/Assignment • Funding Shortfall scenarios (Funds aren’t in EV – yea RIGHT!) • Get well plans and “get to green” plans

  5. What is Ad Hoc EVMS Reporting? Tool designed to focus on specific problem or area Always derived from and reconciled to “source data” User-defined, sophisticated to meet needs Can provide short-term or long-term solution Oh by the way, We each do it everyday!

  6. Types of Ad Hoc and Tailored Reporting • Single Source Engines (Ocean Floor) • ACWP or Estimated ACWP transaction detail • BCWS Estimate detail • BCWP Detail to activity or task • Partially-Integrated Engines (Deep Sea Diving) • BCWS and BCWP detail • ACWP and ETC detail • Fully Integrated Engines (Ocean Surface) • BCWS, BCWP, ACWP, ETC Reporting Detail • Tailored and Fluid Engine (Floor – 5,000 feet) • Established for infinite reporting needs • Changes with Mgmt focus, strategy and business practices

  7. Benefits of Ad Hoc EVMS Reporting? Streamlining data gathering for Analysis • Fast with little or no IT involvement • Using existing software's and datasets (Cheaper) • “Automated” to provide real-time updates and consistent outputs • Short learning curve “We’re already using it” • Basic enough for non-professionals (PM’s, CAM’s, Sr. Mgmt, Other stakeholders) • No external “ongoing” support needed • Can be rapidly deployed to team, Project, Program or Company • Endless options (Scalable) • Charts, Tables, Graphs, Presentations • Drill down capability • On-the-fly analysis • Mathematical Calculation • User-defined fields, styling and layouts • Synergy of team members and counterparts • “Spillman is not intelligent enough to create, but smart enough to mimic”

  8. EVMS Applicability • The intent of an EVMS is to: • provide management information using the organizations resources … compliant with the EVMS principles… allow[ing] any program regardless of size and complexity to realize the benefits of earned value management. • The ANSI-748 recognizes the challenges of analysis by providing clarification that: • “… organizations must have the flexibility to establish and apply a management system that suits their management style and business environment. The system must, first and foremost, meet the organizations needs and good business practices.”

  9. Keys to Success in Ad Hoc and Tailoring Begin with (some) end in mind Leave room to scale and expand Data from trusted (and links) sources Validate, cross-check and validate again Involve Everyone for best ideas and usage KISS – So it can weather a storm or two and SPF Be aware of Number of Databases and tools you use Maintain an organized file structure Permissions and Administration Seek Training in tools and get involved in process

  10. Real Field Examples of Ad Hoc Reporting • Performance Reporting and Analysis by: • Contract Change (REAs or CCPs) • Fund Type, Control Point, CLIN, ABB, or PWBS • Organization (Resp. and Perf.) – crossing cutting the WBS • Fee-bearing scopes of work • CBS – S/C, material, WFO and Risk Breakdown Structure • Below the point of ACWP – when collected at WP or CA • CPRs by Fiscal Year • Lifecycle Reporting when tools are geared to Fiscal Year • Integration of non-standard data points (work location, scope prioritization, work type and complexity) • Weekly Labor Distribution, Overtime, and Downtime reports • Budget (Funding) Short-fall - scope cutting exercises

  11. SV Recovery Plan

  12. POW Example

  13. Weekly Integration (Summary)

  14. Integration – PM Assessment

  15. Scheduler Status

  16. EAC Analysis

  17. Tailored Fee Charts

  18. Spares EVMS Tracking

  19. Ad Hoc and Trailing EVMS Reporting Questions and Answers