20 likes | 154 Views
*DRAFT* 308 Regional Haze SIP/TIP Development Road Map (12-14-04). #1 ID Anthrop. Sources (d)(3)(iv). #3 List all BART-eligible Sources (e). BART Report?. #5 Determine Base Line Conditions (d)(2)(i). EPA Tracking Progress Guide. Base Case Models?. AofH ?. # To be BART’d ?.
E N D
*DRAFT* 308 Regional Haze SIP/TIP Development Road Map (12-14-04) #1 ID Anthrop. Sources (d)(3)(iv) #3 List all BART-eligible Sources (e) BART Report? #5 Determine Base Line Conditions (d)(2)(i) EPA Tracking Progress Guide Base Case Models? AofH ? # To be BART’d ? See #8 # Non-BART ? Internat’l Contrib? GOTO #4 In&Near ? #6 Determine Natural Cond. (d)(2)(iii) EPA Natural Cond. Guide CoH ? #4 Analyze Improvement from BART (e)(1)(ii)(B) #7 Calculate Glide Path Unif. Improv. (d)(1)(B) WRAP Work Plan Formula CALPUFF or Alt? #2 Complete Emission Inventories (d)(4) EDMS On-line? 2018 Proj Models? Trading?
*DRAFT* 308 Regional Haze SIP/TIP Development Road Map (12-14-04) #8 Establish RP Goals (d)(1)(A) #10 Develop LTS (d)(3)(v) LTS Developed ? #11 Tie LTS To Goals, RP Yes Integral Vistas? (51.304) F1 Compl. Cost F1 RAVI, etc F4 Retiremt Repl. All CIAs Completed? F2 Time F2 Constr. Act. F5 SMP Ag/F GOTO #5 Existing SMP No F3 Energy,Non- Air F3 Schedules Limits F6 Enforcmt. Contr. #12 Tie to Regional and National Goal F4 Useful Life • #13 Other SIP Requirements: • 2008 SIP Revision (f) • 5 year periodic review (g) • 5 year adequacy (h) • (4) FLM Coordination (i) • and 51.302 • (5) NSR (51.307) NOTE: Flowchart does not show procedures for optional trading program (e)(2); development of goals for slower rate of progress (d)(1)(ii); resolution of goal disputes (d)(1)(iv); or where other States cause or contribute to impairment (d)(3)(i)-(iii). #9 Goal Consultation (d)(1)(iv)