1 / 2

#1 ID Anthrop. Sources (d)(3)(iv)

*DRAFT* 308 Regional Haze SIP/TIP Development Road Map (12-14-04). #1 ID Anthrop. Sources (d)(3)(iv). #3 List all BART-eligible Sources (e). BART Report?. #5 Determine Base Line Conditions (d)(2)(i). EPA Tracking Progress Guide. Base Case Models?. AofH ?. # To be BART’d ?.

Download Presentation

#1 ID Anthrop. Sources (d)(3)(iv)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. *DRAFT* 308 Regional Haze SIP/TIP Development Road Map (12-14-04) #1 ID Anthrop. Sources (d)(3)(iv) #3 List all BART-eligible Sources (e) BART Report? #5 Determine Base Line Conditions (d)(2)(i) EPA Tracking Progress Guide Base Case Models? AofH ? # To be BART’d ? See #8 # Non-BART ? Internat’l Contrib? GOTO #4 In&Near ? #6 Determine Natural Cond. (d)(2)(iii) EPA Natural Cond. Guide CoH ? #4 Analyze Improvement from BART (e)(1)(ii)(B) #7 Calculate Glide Path Unif. Improv. (d)(1)(B) WRAP Work Plan Formula CALPUFF or Alt? #2 Complete Emission Inventories (d)(4) EDMS On-line? 2018 Proj Models? Trading?

  2. *DRAFT* 308 Regional Haze SIP/TIP Development Road Map (12-14-04) #8 Establish RP Goals (d)(1)(A) #10 Develop LTS (d)(3)(v) LTS Developed ? #11 Tie LTS To Goals, RP Yes Integral Vistas? (51.304) F1 Compl. Cost F1 RAVI, etc F4 Retiremt Repl. All CIAs Completed? F2 Time F2 Constr. Act. F5 SMP Ag/F GOTO #5 Existing SMP No F3 Energy,Non- Air F3 Schedules Limits F6 Enforcmt. Contr. #12 Tie to Regional and National Goal F4 Useful Life • #13 Other SIP Requirements: • 2008 SIP Revision (f) • 5 year periodic review (g) • 5 year adequacy (h) • (4) FLM Coordination (i) • and 51.302 • (5) NSR (51.307) NOTE: Flowchart does not show procedures for optional trading program (e)(2); development of goals for slower rate of progress (d)(1)(ii); resolution of goal disputes (d)(1)(iv); or where other States cause or contribute to impairment (d)(3)(i)-(iii). #9 Goal Consultation (d)(1)(iv)

More Related