1 / 4

1-sec magnetometers

Station Count: Total: 250 CPMN: 54 (second) UCLA-built ( ): 65 (largest). 1-sec magnetometers. Ground Magnetometers. THEMIS GBO/EPO. SMALL. IGPP-LANL. MEASURE. McMAC. SAMBA. SAMBA. Eftyhia Zesta, PI ( ezesta@atmos.ucla.edu )

kaspar
Download Presentation

1-sec magnetometers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Station Count: • Total: 250 • CPMN: 54 (second) • UCLA-built ( ): 65 (largest) 1-sec magnetometers Ground Magnetometers THEMIS GBO/EPO SMALL IGPP-LANL MEASURE McMAC SAMBA

  2. SAMBA • Eftyhia Zesta, PI (ezesta@atmos.ucla.edu) • Data from http://samba.atmos.ucla.edu or directrly from the PI • Currently 12 stations operating from L=1.01 to L=6.54 • 4 Antarctica stations • WSD conjugate to PBQ • Currently, 7 stations are “online”, SER, VLD, OSO, ESC, OHI, PAL, WSD, and 3 have quick contact time frame • Future plans (in the proposing stage):Convert 2 stations to real time for storm monitoring, install an ASI at WSD

  3. Mark Modlwin, PI (mmoldwin@igpp.ucla.edu) Data from http://measure.igpp.ucla.edu or directrly from the PI Currently 11 stations operating, 2 of them recently installed in Quebec New station in Puerto Rico: early 2006 Currently, 4 stations are “online”, real time access: APL, MSH, OTT, Val D’Or Plans to convert all stations to real time access in the summer of 2006 MEASURE

  4. SAMBA and conjugate MEASURE coordinates

More Related