70 likes | 145 Views
Group 3/4. GullfaksVillage 2012 – Group 3 &4. IOR-challenge 1. Existing H1 model with faults and new production wells
E N D
GullfaksVillage 2012 – Group 3 &4 IOR-challenge 1. Existing H1 model with faults and new production wells 1. Discuss geological factors that lead to the good communication Lower Brent Group of the H1 segment at Gullfaks. Make a base case simulation with the H1-model with existing wells. Additional perforations in the wells are possible. 2. The group shall make a simulation run where the transmissibility across all faults are set to zero. 3. Increase the number of wells to get an oil recovery similar to the base case. 4. Calculate the Net Present Value (NPV) of the additional wells in the case of reduced communication relative to the base case. Well cost is 200 MNOK and oil price fixed to 100 $/bbl. Use discount of 8%.
STOOIP in lower Brent is 20,3 MSm³ oil. Lower Brent in H1 has ”only” 57 % recovery factor. Potential 2 - 5 MSm³ mobile oil left. Relatively isolated segment. A lot of data is collected in this area. It was the first production area and therefore a lot of good, initial data. 2 wells in lower Brent, A-35 (injector) and A-39A (producer). 2 producers in upper Brent, B-37(partly in LB) and A-38A. Pressure communication between B-37 and lower Brent. No communication from A-35 to A-38A. 3 Lower Brent, segment H1
Faults in H1 segment • GRID section • All faultsare in Include file all_faults_ksaa191_1.flt • Include file consistof all faults for GF MF UB and LB chooseonlythefaults in H1 LB area • UsekeywordMULTFLT to modify the transmissibility across faults in H1 • Simulate prediction case one more time with closed faults • Compare with previous prediction run
Well Recompletion and New wells • Wells can be recompleted and added in this exercise in Layers 24-52 (LB) • SCHEDULE section • WELSPECS ‘NewWell’ ‘H1’ 40 77 1* ‘ OIL’ / • COMPDAT completion table • WCONINJE for injection wells • WCONPROD for producers • BHP limitation 310 bars for injection wells
Example • COMPDAT • -- WELL I J K1 K2 Sat. CF DIAM KH SKIN ND DIR Ro • 'A-39A' 47 80 35 46 'OPEN' 1* 10.169 0.178 879.363 2* 'Y' 9.143 / • 'A-39A' 47 80 47 47 'OPEN' 1* 10.169 0.178 879.363 2* 'Y' 9.143 / • 'A-39A' 47 80 48 48 'OPEN' 1* 59.249 0.178 4652.653 2* 'Y' 5.971 / • 'A-39A' 47 80 49 49 'OPEN' 1* 0.378 0.178 36.756 2* 'Y' 16.229 / • 'A-39A' 47 79 49 49 'OPEN' 1* 0.971 0.178 94.038 2* 'Y' 15.954 / • 'A-39A' 47 78 49 49 'OPEN' 1* 0.505 0.178 49.426 2* 'Y' 16.752 / • 'A-39A' 48 77 48 48 'OPEN' 1* 8.392 0.178 593.183 2* 'Y' 3.923 / • 'A-39A' 48 76 48 48 'OPEN' 1* 20.916 0.178 1560.038 2* 'Y' 4.835 / • 'A-39A' 48 76 49 49 'OPEN' 1* 0.142 0.178 11.519 2* 'Y' 6.894 / • 'A-39A' 48 75 49 49 'OPEN' 1* 0.224 0.178 21.426 2* 'Y' 15.028 / • 'A-39A' 48 74 49 49 'OPEN' 1* 0.139 0.178 13.622 2* 'Y' 16.766 / • 'A-39A' 48 73 47 47 'OPEN' 1* 61.283 0.178 5387.449 2* 'Y' 9.873 / • 'A-39A' 48 72 47 47 'OPEN' 1* 16.859 0.178 1469.998 2* 'Y' 9.501 / • 'A-39A' 48 72 48 48 'SHUT' 1* 13.356 0.178 1132.827 2* 'Y' 8.363 / • 'A-39A' 48 71 48 48 'SHUT' 1* 9.434 0.178 801.444 2* 'Y' 8.424 / • 'A-39A' 48 71 49 49 'SHUT' 1* 16.988 0.178 1393.035 2* 'Y' 7.193 / • 'A-39A' 48 70 49 49 'OPEN' 1* 27.571 0.178 2376.110 2* 'Y' 8.999 / • /
Presentation title Presenters name Presenters title E-mail address ……@statoil.com Tel: +4700000000 www.statoil.com