An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CRC Energy Efficiency Scheme A business perspective

  2. Eddie Orchard CEng MIET CEnv MIEMAEnvironmental Risk ManagerSiemens plcCorporate Information Technology/Global Shared Services UK

  3. Siemens • Siemens has been at the forefront of technological change and social progress in the UK since 1843 • Its founder, Sir William Siemens, was a pioneering environmentalist, concerned about waste & pollution, clean air and pure water • Siemens UK early successes included:laying the first undersea telegraph cable between Ireland & USAinstallation of the first electric street lighting (Godalming, Surrey)first electric lighting in a UK theatre (Savoy, London) development of the first water meterconstruction of the first public electric railway (Volks, Brighton)

  4. Siemens Today • Energy sector • Fossil Power Generation • Renewable Energy • Oil & Gas • Power Transmission • Power Distribution • Energy Service • Industry sector • Industry Automation • Drive Technologies • Building Technologies • OSRAM • Industry Solutions • Mobility • Healthcare sector • Imaging and IT* • Workflow and Solutions* • Diagnostics • Magnet technologies • Hearing solutions *Marketed as Siemens Healthcare UK • Cross-sector businesses • Siemens IT Solutions & Services • Siemens Financial Services • Other operations • Siemens Real Estate • CIT/Global Shared Services UK

  5. Carbon Reduction Commitment Energy Efficiency Scheme (CRC) • The CRC is a mandatory emissions trading regime for the UK • Its aim is to improve energy efficiency and cut emissions in large public and private sector organisations • It is designed to tackle CO2 emissions not already covered by: Climate Change Agreements (CCAs) or the EU Emissions Trading Scheme • Qualifying organisations are responsible for around 10% of the UK’s CO2 emissions • Qualifying organisations have to fully embrace the scheme or face financial and reputational penalties

  6. Main Drivers for Energy Efficiency Improvements • Cost of allowances, which will not be “recycled” – adds approximately 10% to energy costs • Annual performance League Table ranks participants on energy efficiency performance – impacts on reputation • League Table based on key measures • Automatic metering (Early Action Metric – years 1-3 only) • Carbon Trust Standard or equivalent (Early Action Metric) • Growth of business (year 2 onward) • Absolute energy reduction (year 2 onward – 75% from year 4)

  7. Early Action Metrics

  8. Qualification Requirements • All organisations that had (at the time of registration) at least one settled half-hourly electricity meter qualified for participation • Organisations that consumed more than 6,000 megawatt-hours (MWh) per year of half hourly metered electricity during 2008 qualified for full participation • Qualifying organisations that consumed less than 6,000 MWh during 2008 simply had to make an information disclosure of their 2008 half hourly electricity consumption • Organisations include industry, commerce, supermarkets, water companies, banks, local authorities, schools, universities, hospitals, central Government Departments, etc.

  9. Qualifying Organisations • The CRC scheme started in April 2008 (the qualifying year) • Organisations had to register by the end of September 2010 • Organisations had to report the total electricity they consumed through half hourly meters in 2008 • Qualifying organisations had to identify any subsidiaries that consumed over 6,000 MWh in their own right Significant Group Undertakings (SGUs) • Qualifying organisations were encouraged to implement Early Action Metrics in order to score well on the performance league table

  10. CRC Registrations • Full participants – 2,764 • Organisations required to make information disclosure – 12,500 • Full participants by sector: • Manufacturing – 30.1% • General business activities, real estate, etc. – 24.7% • Councils – 6.8% • Health sector – 5.6% • Wholesale and retail trade, etc. – 5.4% • State education – 3.9% • Trust, co-operatives, etc. – 3.9% • Finance – 3.6% • Central Government, etc. – 3.4%

  11. CRC Registrations by Sector

  12. Evidence Pack • Required to be maintained for regulatory audit • Must include the following information • Company structure and changes to structure • Energy consumption • Significant events • Verifiable records • Signed records of audits of the Evidence Pack • Organisations need to keep track of • Mergers, acquisitions and divestments • Changes in plant and equipment • Failures of meters or systems • Replacement or addition of meters • Changes in energy supply

  13. Scope of Qualifying Organisations • Organisations must identify their top level parent organisation • Top level parent organisation can be based anywhere in the world • All UK organisations and subsidiaries that are ultimately majority owned by the top level parent organisation are within scope • The scope of an overseas owned organisation may include many disparate organisations that have no logical UK grouping or control • For Siemens the top level parent organisation is Siemens AG • Siemens Holdings plc must report the energy consumption for all Siemens AG majority owned businesses purchasing and using energy in the UK

  14. Siemens CRC Compliance Strategy • Cross business team created • CIT/GSS UK – Environmental specialists • Siemens Real Estate (SRE) • Corporate Purchasing – Energy contracts • Facilities Management sub-contractor • CRC Manager appointed with responsibility to achieve cost effective and timely compliance • Engaged with Siemens AG, UK Company Secretary and others to determine structure of Siemens in the UK • Engaged with SRE and all identified Siemens UK businesses to determine UK estate portfolio and energy supply footprint

  15. Scope of Siemens in the UK • Siemens Holdings plc must report the energy consumption for all Siemens AG majority owned businesses purchasing and using energy in the UK • Siemens in the UK is made up of over 30 subsidiaries • Siemens plc is the largest, with over 20 separate businesses • Siemens operates out of approximately 150 sites in the UK • Siemens has 47 half hourly electricity meters across 43 sites 14 subsidiaries have half hourly electricity meters 3 subsidiaries used over 6,000 MWh in 2008 – SGUs

  16. Siemens CRC Improvement Strategy • Early Actions • Achieve Carbon Trust Standard • Improve automatic metering/sub-metering coverage • Develop and formalise Evidence Pack • Long Term Strategy • Reduce energy consumption year-on-year • Minimise costs • Maximise position in the Performance League Table

  17. Energy Reduction and Cost Minimisation Strategy • Energy Reduction Project with Siemens Building Technology • Energy Efficiency Programme – sponsored by Siemens AG • Project for five manufacturing sites (Phase 1)Additional sites to be addressed in Phases 2 and 3 • Siemens Building Technology guarantee carbon/energy savings • Other actions • Siemens Industrial Solutions are to look at energy reductions in the production environment • Improve centralisation of energy purchase process

  18. Proposed Timeline • Phase 1 • Qualification year – 2008 • Registration – Between April and September 2010 • Annual Report and Footprint Report – 29th July 2011 • Annual Report and Purchase of Allowances – 2012 (£12 / tonne) • Also 2013 and 2014 Phase 2 • Qualification year – 2012/13 • Registration – Between April and September 2013 • Annual Report and Footprint Report – 2013/14 • Annual Report and Surrender of Allowances – 2015 (price????) • Performance League Table published every yearstarting October 2011

  19. Timeline – Current and Proposed

  20. The CRC in a Nutshell • Basic requirement is to: • Register • Monitor • Report • Buy and Surrender Allowances • Maintain Evidence Pack • Ever decreasing cap on number of allowances (increasing costs) • Significant impact – Cost and reputation • Primary and secondary energy consumption only (gas, oil and electricity) • Liable to add approximately 10% to energy costs (increasing)