1 / 7

Backup Trigger

Backup Trigger. ANITA 2 SHORT boards are convert to full-band. Modification: Break into the chain before the diode. Completed ANITA 3 SHORT assembly. 8 channels available per SHORT. S11 measurements. Iridium Open Port u nder evaluation as a possible Telemetry link.

kaye-lester
Download Presentation

Backup Trigger

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Backup Trigger • ANITA 2 SHORT boards are convert to full-band Modification: Break into the chain before the diode

  2. Completed ANITA 3 SHORT assembly 8 channels available per SHORT S11 measurements

  3. Iridium Open Port under evaluation as apossible Telemetry link Data Rates as high 80 kbps (observed during ground test) Data Transfer Bidirectional Frequency of Operation: TX and RX – 1616 to 1626.5 MHz at average power of 6 watts Photoshop Drawing for illustration (Drew Denny)

  4. ANITA II Mast with flight GPS antenna mounted GPS antenna Support Frame test setup (University of Delaware, Trabant Parking Structure, Top Level) University of Delaware

  5. Altitude Check on the GPS signal simulator

  6. New Flight Temperature Sensors are ready for integration

  7. University of Delaware ANITA Campaign Personnel Primary Candidates: Katie Mulrey – Graduate Student John Clem – Scientist Secondary Candidate: James Roth - Senior Technician GSE Computer Support: Daniel DeMarco – Scientist / IT personnel

More Related