and transportation. Environmental Issues. China and the Environment. China approved the Kyoto Protocol on 30 August Pollution levels: Total Suspended Particulates Paris – 14 Beijing – 377 Sydney – 54 Shanghai – 246 Kuala Lumpur – 85 Urumqi – 515
E N D
China and the Environment • China approved the Kyoto Protocol on 30 August • Pollution levels: Total Suspended Particulates Paris – 14 Beijing – 377 Sydney – 54 Shanghai – 246 Kuala Lumpur – 85 Urumqi – 515 Bangkok – 223 Taiyuan – 568 Jakarta – 271 Lanzhou – 732 and it results in this: 3
GD LNG – Project Background Guangdong Province • Population of over 75 million • 10-15% growth per year for the last 10-15 years • Contributes about 10% of China’s GDP • Contributes about 38% of China’s total exports 6
GD LNG – Project Background Project being developed in two phases • Phase 1: Regasification terminal and 300km of transmission pipeline in Guangdong and branch lines to Hong Kong • Phase 2: additional 2MMTPA volume and extension of trunkline around western side of Pearl River Delta Imports scheduled to commence in 2005 7
GD LNG – Project Background • Feasibility Study Report to be submitted to the SDPC later this year • If FSR approved, JV Company will be formed 8
GD LNG – Project Background ownership • CNOOC 33% • Shenzhen Investment Holding 14% • Guangdong Yuedian Power Assets 6% • Guangzhou Gas 6% • Dongguan Fuel Industrial 2.5% • Foshan Municipal Gas 2.5% • Hongkong Electric 3% • Hong Kong & China Gas 3% • BP 30% 9
GD LNG: Demand Side Phase I: 11 customers (~3.28 MMTPA): • HK Buyers (0.80 MMTPA) HongKong Electric (6 x 300 MW) Hong Kong & China Gas • PRC power generators (1.62 MMTPA) Dongbu (3 x 350 MW) Huizhou (3 x 350 MW) Qianwan (3 x 350 MW) Meishi (Oil-to-Gas Conversion) • PRC towngas (0.86 MMTPA) Dongguan, Foshan, Guangzhou, Nanhai, Shenzhen 11
GD LNG: Demand Side Phase II • Increased take by Phase I customers • City gas customers on the east bank of the Pearl River Delta e.g. Zhuhai, Zhongshan, Jiangmen and Heshan • Additional oil-to-gas conversion power plants 12
GD LNG: Supply Side • Supplier is Australia LNG • 25 year contract worth around US$13 billion • 3 MMTPA from NWS 4th train 13
GD LNG: Supply Side • CNOOC Ltd will acquire equity interest in the NWS • Creation of China LNG Joint Venture • Will own the LNG supplied to Guangdong, and associated condensates and LPGs • CNOOC Ltd offered 25% interest • Price of around US$320 million plus tariff for access to NWS infrastructure 15
BHP BP Chevron MIMI Shell Woodside 12½% each CNOOC LTD NWS Partners 25% 75% China LNG JV China LNG
GDLNG: Shipping • 2-3, 145,000 cu.m vessels • Vessels to be owned: • COSCO & China Merchants 40% • NWS 39% • Chinese owners 21% • Ship management company to be established: • COSCO & China Merchants 60% • NWS 40% 17
China Merchants Cosco CCM JV Co Chinese Owners NWS 40% 21% 39% Vessels Hudong Zhonghua Shipbuilders Chantiers de l'Atlantique 60% 40% Ship Management Co GDLNG: Shipping
GDLNG: Project Issues • Land • Consents • LNG Supply and Shipping • Downstream Gas Sales • Construction • Financing 19
Future LNG Prospects • Guangdong Phase II • Fujian • Zhejiang? • Shanghai? • Jiangsu? • Shandong? 20